Orange County NC Website
SECTION 306 FORM OF CORSTRUCTION CONTRRCT <br />.(ALL PRIME CONTRACTS) <br />THIS AGREEMENT, made the 25th day of <br />the 'year of 19_9J by and between <br />June in <br />e Air Conditioners, Inc., Durham, NC <br />hereinafter called the Party of the First Part and the SXA XAMF <br />4�s#�kxa�e.IcX��cx�c� County of Orange, North Carolina <br />hereinafter called the Party of the Second Part. <br />WITNES @ETE: <br />That the Party of the First Part and the Party of the second <br />Part for the consideration herein named agree as follows: <br />1. Scope of work: The Party of the First Part shall furnish <br />and deliver all of the materials, and perform all of the work in <br />the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a <br />part thereof as if fully contained herein: Advertisement, In- <br />structions to Bidders, General Conditions, Supplementary %General <br />Conditions, Specifications, Accepted Proposal, Contract, Perfor- <br />mance Bond, Payment Bonc, Power of Attorney, Workmen's Compensa- <br />tion, Public Liaility, property Damage and Builder's Risk Insu- <br />rance Certificates, 7�rR�kX ?(X�Cg.tj45t)i1(XI�tXX�iFtFXX� X <br />�1leX CD�X9(XdiBX$I X tX�d lfX�7 c d� *_W and Drawings, entitled: <br />e C unt Gavernment ervices Center <br />Hi orou , <br />Consisting of the <br />- - nd <br />Dated -: M.016, <br />Addendum.No. l: <br />Addendum No. 2 <br />Addendum No. 3 <br />following sheets: Heatin , Air - Conditioning and <br />on CO C -2 C -4 C -6 M- t ru - an <br />S ecifications date <br />991 and the following addenda: <br />Dated 5/29/91. Addendum No, Dated <br />Dated 5/31/91 Addendum No. Dated <br />Dated 6%3/91 Addendum No. Dated <br />Addendum No. __4__ Dated 6� Addendum No. Dated <br />2. That the Party -!of the First Part shall commence work to <br />be performed under this Agreement on a date to be specified in a <br />written order of the Party of the Second Part and shall fully <br />complete all work hereunder within <br />x;XcX�x7acX�s,X�9xX� For each day in excess thereof, <br />liquidated damages shall be as stated in Supplementary General <br />Conditions. The Party of the First Part, as one of the <br />considerations for the awarding of this Contract, has furnished to <br />the Party of the Second Part a construction schedule setting forth <br />planned progress of the project broken down by the various divi- <br />sions or part of the work and by calendar days. In the event that <br />the progress of the work is not maintained on schedule by the <br />Party of the First Part, or in the event the work is not completed <br />Within the time above specified, the Party f the sand p rt may <br />*.365 calendar days from notice -to- proceed for Phase I. Phase Ir will <br />4e complieted 60 calendar days after acceptance of Phase I and a two - <br />Week period for moving offices. <br />3 -47 <br />