Orange County NC Website
I <br />SECTION 306 FORM OF CONSTRUCTION COPTUCT <br />(ALL PRIME CONTRACTS) <br />THIS AGREEMENT, made the 25th day of June in <br />the 'year of 19_,, by and between <br />Lee Air Conditioners, Inc., Durham, NC <br />hereinafter called the Party of the First Part and the 3Xjx cxgiK <br />l�fll�X�vc:Kxi�Fi}i�ff� County of Orange, North Carolina <br />hereinafter called the Party of the Second Part. <br />WITKES@ETR: <br />That the Party of the First Part and the Party of the second <br />Part for the consideration herein named agree as follows: <br />1. Scope of work: The Party .of the First Part shall furnish <br />and deliver all of the materials, and perform all of the work in <br />the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a <br />part thereof as if fully contained herein: Advertisement, In- <br />structions to Bidders, General Conditions, Supplementary %General <br />Conditions, Specifications, Accepted Proposal, Contract, Perfor- <br />mance Bond, Payment Bond, Power of Attorney <br />iat�llt , Workmen's Compensa- <br />tion, Public Ly, Property Damage and Builder's Risk <br />rance Certificates, AWXN=ackxxMcxXlXX xSIx xx <br />kbax�cd5a6c�aacacxaXxsxca�gxxcc ��S 5gi� Insu- <br />cx ". <br />and County nnvernment K rvices Centerawings, entitled: <br />H1 nrne�n <br />Consisting of the following sheets: Heating, Air- Conditioning and <br />CO, C -2 C -4 an <br />-A-1 thrij A-19 d S ecifications date <br />Dated: May 160 1'991- . <br />and the following addenda: <br />Addendum.No. _ 1. Dated 5f29/91 Addendum No. bated <br />Addendum No. 2 Dated 5731/91 <br />Addendum No. Dated <br />Addendum No. 3 Dated 6/391 Addendum No. <br />Dated <br />Addendum No. --.L_ Dated 4 91 <br />� Addendum No. Dated <br />2. That the Party'aof the First Part shall commence work to <br />be performed under this Agreement on a date to be specified in a <br />written order of the Party of the Second Part and shall fully <br />complete all work hereunder within <br />3FftbWAIM#(XX cXX,tU QXgglgxXgl!gli. For each day in excess Nthere <br />liquidated damages shall be as stated in Supplementary General <br />Conditions. The Party of the First Part, as one of the <br />considerations for the awarding of this Contract, has furnished to <br />the Party of the Second Part a construction schedule setting forth <br />Planned progress of the project broken down by the various divi- <br />sions or part of the work and by calendar days. In the event that <br />the progress of the work is not maintained on schedule by the <br />Party of the First Part, or in the event the work is not completed <br />within the time above specified, the Party f th S and p rt may <br />* 365 calendar days from notice -to- proceed for P�iase f. Phase i will <br />4e completed 60 calendar days after acceptance of Phase I and a two - <br />week period for moving offices. <br />3 -47 <br />18 <br />