Browse
Search
Agenda - 06-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 06-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:04:11 AM
Creation date
11/8/2017 10:47:00 AM
Metadata
Fields
Template:
BOCC
Date
6/25/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
806
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 306 FORM OF CONSTRUCTION CONTRACT <br />i (ALL PRIME CONTRACTS) <br />THIS AGREEMENT, made the 25th day of June in <br />the year of 19� by and between C. J. Kern, Contractor Inc., <br />Greensboro, NC. <br />hereinafter called the Party of the First Part and the Sxae)wxgjK <br />hUVtXxX*WdQW4UXXtKftXWxtxp5g County of Orange, North Carolina <br />hereinafter called the Party of the Second Part. <br />WITNESSETH: <br />That the Party of the First Part and the Party of the second <br />Part for the consideration herein named agree as follows: <br />1. Scope of Work: The Party of the First Part shall furnish <br />and deliver all of the materials, and perform all of the work in <br />the manner and form as provided by the following enumerated plans, <br />specifications and documents, which are attached hereto and made a <br />part thereof as if fully contained herein: Advertisement, In- <br />structions to Bidders, General Conditions, Supplementary General <br />Conditions, Specifications, Accepted Proposal, Contract, Perfor- <br />mance Bond, Pavment Bond, Power of Attorney, Workmen's Compensa- <br />tion, Pub:_c Lia -_;.lity, Property Damage and Builder's Risk Insu- <br />rance Certificates, �kXxN�cxx lckm�txvHxSeaq�XXQ��x�cx <br />RDaxxcacxaRxsxamxca�etx#cc ��x, and Drawings, entitled: <br />e Count Government Services Center <br />u, C Ar.,,,., <br />Consisting of the following sheets: For General Construction work on 11 thru C -6 S -1 thru 5-13 L-1 t ru an <br />Dated: May 16, 1991 <br />and the following addenda: <br />Addendum <br />No. <br />1 <br />Dated <br />5/29/91 <br />Addendum <br />No. <br />Dated <br />Addendum <br />No. <br />2 <br />Dated <br />5/31/91 <br />Addendum <br />No. <br />Dated <br />Addendum <br />No. <br />3 <br />Dated <br />6/3„/91 <br />Addendum <br />No. <br />Dated <br />Addendum No. 4- Dated 6 Addendum No. Dated <br />2. That the Party �f the First Part shall commence work to <br />be performed under this Agreement on a date to be specified in a <br />written order of the Party of the Second Part and shall fully <br />complete all work hereunder within <br />3;* WAftXXXN%WX1rUkX98,1VXXdata, For each da-7 in excess thereof, <br />liquidated damages shall be as stated in Supplementary General <br />Conditions. The Party of the First Part, as one of the <br />considerations for the awarding of this Contract, has furnished to <br />the Party of the Second Part a construction schedule setting forth <br />Planned progress of the project broken down by the various divi- <br />sions or part of the work and by calendar days. In the event that <br />the progress of the work is not maintained on SChadul• by the <br />Party of the First Part, or in the event the work is not completed <br />within the time above specified, the Pa ty of th Se and art may <br />365 calendar days from notice -to- proceed Tor Phase �. Phase II will <br />be completed 60 calendar days after acceptance of Phase I and a two - <br />week period for moving offices. <br />3 -47 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.