Browse
Search
Agenda - 06-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 06-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:52:34 AM
Creation date
11/8/2017 10:43:48 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />Ms. Emily Cameron <br />April 1, 1991 <br />Page 2 <br />not be properly installed. The solution to this problem is to provide additional treatment area. <br />Secondly, in requesting state approval for additional treatment area, we now fall under the new <br />state guidelines which require additional linear footage per homesite as well as additional <br />buffering around each field. Again, this results in the need for additional treatment area to meet <br />the new state guidelines. The revisions to Phase II are designed to meet these requirements. <br />In summary, Piney Mountain was created to serve as a model for quality development in Orange <br />County. Our insistence on quality includes proper installation of our septic system. The Phase <br />II revision represents additional conservatism being built into the system. We want Piney <br />Mountain to always remain a .standard for quality development. After all, it is our homeplace! <br />Thank you for your consideration. <br />Sincerely, <br />Mark N. O'Neal <br />Managing Partner <br />13Iftiln[•7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.