Browse
Search
Agenda - 06-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 06-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:52:34 AM
Creation date
11/8/2017 10:43:48 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />RESOLUTION <br />OF THE <br />ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS <br />Date: June 3 1991 <br />Name of Subdivision: Piney Mountain - Phase Two Amended <br />Owner /Applicant: Mark O'Neal for Piney Mountainj a NC General <br />Partnership <br />The Board of County Commissioners hereby approves the amendment to <br />Phase Two of Piney Mountain Subdivision preliminary plat, dated March <br />18, 1991 and containing 35 lots, subject to the fulfillment of <br />requirements specified herein. <br />The right -of -way for the stub -out of Twin Pines Lane shall be <br />irrevocably dedicated to the general public. The approval of this <br />resolution authorizes and directs the Orange County Manager to accept <br />for Orange County and on behalf of the public generally, the offer of <br />dedication of the right -of -way for the stub -out of Twin Pines Lane. <br />This acceptance by Orange County of the dedication to the general <br />public of the right -of -way for the stub -out of Twin Pines Lane shall be <br />without maintenance responsibility. These roads shall be maintained by <br />the owner /applicant until such time as they are accepted for <br />maintenance by the North Carolina Department of Transportation or some <br />other governmental body. Before the Final Plat of amendment to Phase <br />Two of Piney Mountain can be recorded: <br />A. Sewage Disposal <br />1. The community low pressure system for sewage disposal shall <br />be approved by the State Division of Environmental <br />Management. <br />2. Obtain approval of the monitoring well(s) from the State <br />Division of Environmental Management. <br />3. Lot Q is of restricted development potential because the lot <br />is reserved for utility purposes. The restricted lot shall <br />be identified in a document describing development <br />restrictions and requirements to be prepared by Planning <br />Staff and recorded concurrently with the Final Plat. <br />4. Submit an engineer's estimate for the cost of construction of <br />the sewage disposal system and monitoring well(s). <br />5. Revise the current letter of credit, or obtain an additional <br />financial guarantee for 110% of the estimate for installation <br />of the community low pressure sewage disposal system and <br />
The URL can be used to link to this page
Your browser does not support the video tag.