Browse
Search
Agenda - 06-03-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 06-03-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:52:34 AM
Creation date
11/8/2017 10:43:48 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />1 4 <br />Habitat for Humanity <br />15 March 1991 <br />Preliminary Opinion of Probable <br />Construction Cost for <br />Letter of Credit /Bond <br />Chestnut Oaks, Phase IIA <br />1. <br />2. <br />3. <br />4. <br />5. <br />7. <br />S. <br />9. <br />Clearing and Grading <br />8" C.A.8.C, <br />2" 1 -2 <br />30" RCP <br />30' FES <br />Rip rap apron <br />Erosion Control <br />Seeding <br />Private Well <br />3 <br />range County NC Inc <br />PO Box 3673 Chapel Hill NC 27515 <br />UNITS UNIT PRICE TOTAL <br />Lump sum <br />$15,000 <br />$15,000 <br />4,500 sy <br />56.00 /sy <br />27,000 <br />4.500 sy <br />$4.50/Sy <br />20,500 <br />25 If <br />$35.00/If <br />900 <br />2 each <br />$700.00 <br />1,400 <br />1 ton <br />625.00 /ton <br />50 <br />Lump sum <br />53,000 <br />3,000 <br />0.8 acres <br />54,000 /ac <br />3,200 <br />1 each <br />$2,500 <br />2,500 <br />wwwwwrrr <br />Subtotal <br />$73,100 <br />Pius <br />10% of Subtotal <br />7,310 <br />rrwwwwww <br />TOTAL BOND REQUIRED <br />$80,410 <br />NOTES: <br />1. Landscaping requirements may be met with existing trees per approval <br />of Orange County Planning Department. <br />2. This estimate has been prepared for the exclusive use of Habitat for Humanity <br />of Orange County for their use In determining the amount of bond /letter of <br />credit required for Phase IIA of Chestnut Oaks. Actual construction cost <br />will vary. This is not a guarantee of the cost of construction of <br />Infrastructure for the subject project. <br />Prepared By: Kenon R. Blackwood. P.E. <br />"Building Houses in Partnership with God's People in Need" <br />
The URL can be used to link to this page
Your browser does not support the video tag.