Orange County NC Website
004 <br />and or vehicular ccess or circulation <br />including road c1 ssification. <br />&„ any c a e i the rovisi n of services <br />s h As water su l a d wastewater <br />disposal_. <br />91 any su s an is chan a in the location of <br />11tilities or other easements. <br />T e su iv's'on shall be-suble--t to review by <br />all a22licgbi a eview a encies as is re fired <br />•'+� aiG <br />considered minor changes, the Plannin <br />alrgptor or his her authorized Agent may-rm- <br />apgrgve the 2reliminary—lat, with condition <br />of a r val stated in a format which <br />substantially substgntially conforms to the Resolution of <br />A royal ado ted by the Board of Commissione s` <br />when ar)Rroving a reliminar lat. <br />III-D-2-g. FurtheX Time Extensions <br />Q-n_lv one admi istrative re -a royal may bg <br />approved for anY subdivisi n. If a re- <br />ARgroved Preliminary Plat Mires Where <br />Mme period h" e1aVsa4;&r the developer shall <br />be required to resubmit a new Preliminary Plat <br />for the tract or portion thereof for which <br />approval has expired. The new plat shall be <br />subject to all applicable regulations in <br />existence at the time of resubmittal. <br />Provided, however, the development phasing <br />plan approved as part of the Preliminary Plat <br />(hereafter "the phasing plan ") may be amended <br />by the Board of Commissioners upon application <br />by the subdivider. In determining whether to <br />approve an amended phasing plan, the Board of <br />Commissioners shall consider: <br />(1) whether or not approval of other <br />diligently pursued regulatory <br />requirements can be obtained before the <br />expiration of the time periods <br />established in the phasing plan; and <br />(2) the quality of and length of time of the <br />experience of the subdivider in managing <br />development projects; and <br />(3) whether factors other than market <br />conditions and beyond the control of the <br />subdivider caused a delay in meeting the <br />phasing plan; and <br />(4) whether the development project, if <br />completed consistent with the approved <br />