Browse
Search
Agenda - 05-21-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 05-21-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:47:51 AM
Creation date
11/8/2017 10:40:18 AM
Metadata
Fields
Template:
BOCC
Date
5/21/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM-s. officials, or other guaiifigd persons authorized by CMU MWI Rgdodically t the sites 15 <br />Of land in —activiiy to determine: <br />co ce with the Act this QEdinwces or rules or orders lftWd or issued ursuant to this <br />°rdtna= <br />whether the Wfivity is being conducted in accordance with an a roved Tart• and <br />what ow tt7P. MAGO . ..oe....r. A ... .L— _t_" _ __ _ eve ... _ <br />from land-disturbing activity. <br />Notice of the ri ht to iMMt shall be included in the notification of Tart a royal. <br />COMMENTARY.• This change is intended to clearly give the rightfor authorized personnel to enter and inspect <br />sites. <br />b. Notice of Violation <br />If, through inspection, it is determined that a person engaged in land-disturbing activity has failed to <br />comply with the Act this Ordinance or rules or orders ado tact or issued umant to this Ordinance <br />or has failed to commonly_ with the approved plan, a notice of violation shall be served upon that person <br />by registered or certified mail, return receipt requested, or other means seasonably calculated to give <br />actual notice. The notice shall set forth the measures necessary to achieve compliance with the plan, <br />specify a reasonable time period within which such measures must be completed, and warn that failure <br />to correct the violation within the time period will result in the assessment of a civil penalty or other <br />enforcement action. However. no time neriM fnr rnrnnl:o..na ..ma L.. ...__ _ <br />re=tative while in the W_--- ..` UK <br />" <br />rocess of out their official duties. If the person engaged in land - <br />disturbing activity fails to comply within the time specified, enforcement action shall be initiated. <br />COMMENTARY.- Failures that constitute a violation are clarifed. A time limit to correct certain specified <br />violations (failure to submit a plan and interfering with the right to inspect) is not required. <br />Section 22 Penalties <br />a. Civil Penalties <br />(1) Assessment of Penalties <br />Any person who violates any of the provisions of this ordinance or rules or orders adopted or issued <br />Pursuant to this ordinance, or who initiates or continues a land-disturbing activity for which an erosion <br />control plan is required except in accordance with the terms, conditions, and provisions of an approved <br />Plan, shall be subject to a civil penalty of x}96 500 except that the penalty for failure to submit an <br />erosion control plan shall be as provided in a.3. of this section. No penalty shall be assessed, until the <br />Person alleged to be in violation has been notified of the violation by registered or certified mail, return <br />receipt requested, or other means reasonably calculated to provide actual notice to the offender. The <br />notice shall describe the violation with reasonable particularity, specify a reasonable time period within <br />Which the violation must be corrected, and warn that failure to correct the violation within the time <br />Period will result in the assessment of a civil penalty or other enforcement action. However, no time <br />riod for emliance need be given for failure to submit an Erosion Control Plan for royal or for <br />qbstructing. hampering or interferin th an ffiLdegized MRMMtMt;ive_ while in the rocess of <br />out his official duties Each day of a continuing violation shall constitute a separate violation under <br />Section 22(a)(1). <br />COMM ATARY.• Fines are increased to $500 per day. No time period for compliance is allowed for failure <br />to submit a plant or interfering with the right to inspect. <br />(2) Demand for Payment of Penaft <br />The Orange County Board of Commissioners shall make written demand for payment upon the person <br />10 5 -9 -91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.