Browse
Search
Agenda - 05-21-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 05-21-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:47:51 AM
Creation date
11/8/2017 10:40:18 AM
Metadata
Fields
Template:
BOCC
Date
5/21/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
storm which Rmduces tbg maximum Rok rate of o - The mk rate of off shan be <br />calculated rMrding to nEMgd M in the U 'red States Dandmol of AgTiculture So' <br />Consery tion cs's ational n ineerin Field Manual for Conservation &acticej or 10 <br />rd:m to RMgghM aftWd by My othq anacy of Ws state or tho United States or <br />an tY recd tion or association. <br />COALNEWLIRY.• The purpose of the change in the above paragraph is to require a higher level of <br />sediment- trapping efficiency in High Quality Waters (refer to the definition in Section 3). For a number of <br />reasons, however, this change has little practical impact in Orange County. (1) the amendment specifies <br />improved performance for sediment ponds only, and, because of the type of development that usually occurs <br />in these rural HQW, it would be unlikely that a sediment pond would be used; (2) existing standards in <br />the Erosion Control Manual require both sediment ponds and sediment traps (which are most often used <br />in these areas) to be designed and constructed to a greater efficiency than this amendment requires; and <br />(3) the standards in the Manual apply not only to HQW but to all of Orange County and Chapel Hill. <br />d. Newly constructed 9M channels in HOW MGM shall be desi ed and constructed with side <br />slope�t no steeper than 2 horizontal to --I vertical if a vegetative cover is_used for stabilization <br />unless soil conditions RRrmit a Ltqjper sIgN or where the SI9M are stabilized by using <br />mechanical devices structural devices or other table devices. In any event the angle for <br />side sigm shall be sufficient to restrain accelerated erosion. <br />e. 9-Lound cove sufficient to restrain erosion must be provided for any portion of a land - <br />disturbing activity, in a HOW zone within 15 working days or 60, calendar days. whichever <br />RLrjod is shorter, followin coMWetion of mnstructian or development. <br />COA"ff"ARY.• These amendments were adopted by the Legislature to provide additional protection for <br />High Quality Waters. The revision concerning sediment ponds in Section 8 (d) (1) is a change proposed <br />by the staff. "Sediment pond " is used instead of "sediment basin " because it is the term used in the Erosion <br />Control Manual. <br />Section 9 Stormwater Outlet Protection <br />action of Stream Banks and Channels <br />C0A"ff- MARY.• To clarify the intent of this section, the title has been changed . <br />or <br />elarelepment— <br />if eanditiom 0) and (ii) of this peiagiVh C=wt be nwt, the ehmtad below Ow diwhwge point shaft <br />C0M MWARY.• The text above will be deleted and replaced by the text below. <br />5 5 -9 -91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.