Browse
Search
Agenda - 05-06-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 05-06-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:50:37 AM
Creation date
11/8/2017 10:39:28 AM
Metadata
Fields
Template:
BOCC
Date
5/6/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />5 <br />History of Growth at OPC <br />Number of Staff in 1980 - 90 Staff <br />Number of Staff in 1990 - 200 Staff <br />122% Growth in 10 Years <br />Current area most in need of relief is Northside Community Mental Health <br />Center which was renovated and occupied in 1978 by a staff of 35. Today there <br />are 63 staff housed in the building and OPC cannot accommodate even one more <br />staff member. After conducting a spatial needs assessment, acquiring a free- <br />standing modular and renovating the lower level of our current building <br />seemed to be the most cost effective way to address the Northside space <br />problem. We encountered serious problems in siting the modular due to sewer <br />encroachments and costs that were higher than orginally planned. Therefore, <br />the space committee recommends that we abandon the modular plan and instead <br />construct an addition to Northside Building 12. This is in addition to the <br />renovation project. <br />PHASE I Construct addition to Northside, approximately 1400 square feet. <br />This is instead of modular acquisition (24'X 58' or 1392 square <br />feet). No special use permit is required since the addition. <br />involves less that 5% of the total Northside site square footage. <br />(Northside complex square footage is 28,590, 5% of which is 1424 <br />square feet.) It is necessary only to modify the existing special <br />use permit. <br />PHASE II Renovate lower level of Northside Building #2. Net gain is ten <br />offices, four to five secretarial areas, better flow and improved <br />departmental groupings. <br />PHASE III Acquire and renovate Northside Building #1 when Southern Orange <br />Human Services Building is complete. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.