Browse
Search
Agenda - 05-06-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 05-06-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:50:37 AM
Creation date
11/8/2017 10:39:28 AM
Metadata
Fields
Template:
BOCC
Date
5/6/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elp <br />ALTERNATIVE 2, LUP -4 -90 <br />10 /16/50 <br />9(20190 <br />1. SPECIFIC CHANGES TO TEXT OF JPA 1,PS'D USE PLAN <br />SECTION III. INFRASTRUCTURE AND PUBLIC SERVICES <br />Paae 32 °water and Sewer Issues..." last cranh <br />(NOTE: The purpose of this change is to clarify and add to <br />e. %istiag language in the Plan which outlines differe:'t <br />r„ethods of wasteWater collection. A new final paragraph has <br />-CL: - 'F_ DFE cd�B 7,,n t. crenCF ^c <br />2w.FC. <br />:,o.i_tG'red altcrnC _1JC c•.c�E.- c �r7t *, "r�' c_�n .,w _a e <br />portions of the buffer. This section is aescrip:Ive in nature <br />and does not relate to the location Cr means of wastewater <br />pravisior, beyond the outline currently present in the olan. ) <br />"The New Hope Creek Basin and the "Southern Triangle" cannot <br />easily be served since they are both "over the ridge" from <br />the existing wastewater collection system and treatment <br />plant. Alternative means of providing wastewater collection, <br />4reatm.ent and disposal services in these areas are: <br />- ma-, c_ ournp star ion and force main <br />- Limited number of smaller, interim pump stations <br />- Construction of a new wastewater treatment facility <br />- Series of <DELETE> alternative or package treatment <br />facilities <br />- Individual on -site wastewater disposal systems <br />At this time, the final two alternatives shown above <br />(Alternative /Package systems and individual on -site disposal) <br />appear to be more feasible for the New Hope basin and the <br />"Southern Triangle ". To ensure that any alternative <br />wastewater systems in these areas are properly maintained and <br />adequately monitored, these systems should be permitted only <br />under the premise of public oversight through a public entity <br />to be named by the three governing bodies. Public oversight <br />of alternative systems might greatly mitigate concerns over <br />the function and place of such facilities." <br />SECTION V. JOINT PLANNING OPERATING PRINCIPLES <br />Page 60 "Rural Buffer and Conservation." <br />(NOTE: Iris section of the plan ex la.ins the ,joint rla:�niny <br />Land Use Classification System. Language is being added to <br />clarify the definition of the Rural Buffer category in terms <br />of the Rural Character Study Committee's recommendations. <br />Also, it should be noted here that, although the University <br />"r' <br />
The URL can be used to link to this page
Your browser does not support the video tag.