Browse
Search
Agenda - 04-16-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 04-16-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:42:28 AM
Creation date
11/8/2017 10:35:00 AM
Metadata
Fields
Template:
BOCC
Date
4/16/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />w, <br />�bb': <br />F <br />We have been advised by the Architects that items one through four can <br />be addressed with negligible cost implications. Study is on -going to <br />determine the feasibility of each request. Study is likewise still on- <br />going to determine the feasibility of relocating the air conditioning <br />units <br />(item 5). <br />The remaining items would add to the project cost as follows: <br />1. <br />Entrance doors with individual glass <br />panes for a more traditional appearance <br />$ 4,000 <br />2. <br />Modifications to exterior fire stair <br />5,000 <br />3. <br />Modifications to exterior screen walls at <br />mechanical equipment units (two locations) <br />8,000 <br />4. <br />Change brick bond from Running Bond to <br />Flemish Bond <br />$11,255 <br />5. <br />Increase wall projections from 16" to 32" <br />at six locations in building; adds 400 s.f. <br />to building. This change affects about <br />24 sheets of design drawings. <br />28,500 <br />This is the most significant design <br />change requested by the Historic District <br />Commission. The intent of the change is <br />to break the facade so the building will be <br />more in keeping with the existing Courthouse <br />and other buildings in the vicinity, while <br />still maintaining the design integrity of the <br />new structure. <br />TOTAL <br />$56,785 <br />It is suggested that any added items be funded one of two ways: <br />1. Use of the contingency set up within the project budget; or <br />2. Increase the overall project budget by appropriating funds <br />from the County's Capital Reserve Fund. <br />As a point of information, the project contingency is approximately <br />$125,000, but does cover both the new construction and the renovation <br />of the existing Tax and Records Building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.