Browse
Search
Agenda - 04-01-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 04-01-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:46:23 AM
Creation date
11/8/2017 10:34:03 AM
Metadata
Fields
Template:
BOCC
Date
4/1/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
576
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRESCENT RIDGE <br />ORANGE COUNTY <br />CERTIFICATION AND APPROVALS ! PRELIMINARY PLAT <br />STAFF ASSIGNMENT: Emily Cameron <br />CONCEPT PLAN: Accepted 9 13 90 <br />PRELIMINARY PLAT: Accepted _i 25 .91 <br />REVISED PRELIMINARY PLAT: Received <br />Approved 10/15/90 <br />Reviewed <br />Reviewed <br />NCDOT: DATE: 2 15[91 CERTIFICATION: Mike Cowan, District Engineer <br />SCHOOL BOARD (Chapel Hill- Carrboro): DATE: 2 1191 <br />CERTIFICATION: M.L. Truelove <br />UTILITIES (OWASA /Hillsborough /Mebane /Orange Alamance /Durham): <br />DATE: <br />CERTIFICATION: <br />OTHER: Chapel Hill <br />Carrboro <br />Environmental Health <br />Soil & Water <br />Erosion Control <br />D. <br />Mosele 2/21/91 <br />(Date) <br />W. <br />burgelb5 31& <br />/91_ <br />(Date) <br />J. <br />Stimpson 1/25/91_ <br />(Date) <br />G. <br />Hughes 2/4191 <br />_ <br />(Date) <br />W. <br />FAircloth 311191 <br />(Date) <br />PLANNING BOARD: Date: 3/18 /91_ Approval <br />Approval with Condition(s) xx Denial <br />BOARD OF COMMISSIONERS: Date: Approval <br />Approval with Conditions) Denial <br />
The URL can be used to link to this page
Your browser does not support the video tag.