Orange County NC Website
THE AMERICAN INSTITUTE OF ARCHITECTS <br />AIA Document A311 <br />Performance Bond <br />KNOW ALL MEN BY THESE PRESENTS: that Trout & Riggs Construction Co.., In <br />(Here insert full name and address or legal title of Contractor) <br />P. 0. Box 15160, Durham, N. C. 27704 <br />as Principal, hereinafter called Contractor, and, Great American Insurance Company <br />(Here insert full name and address or legal title of Su rcty) <br />Cincinnati, Ohio <br />as Surety, hereinafter called Surety, are held and firmly bound unto County of Orange <br />(Here insert full name and address or legal title of Owner) <br />P. 0. Box 8181, Hillsborough, N. C. 27278 <br />as Obligee, hereinafter called Owner, in the amount of Two Hundred Seventy Six Thousand, <br />Seven Hundred and nol100 ------------------------------- ----------- - - - - -- Dollars ($ 276,700.00 ), <br />for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, <br />successors and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, <br />Contractor has by written agreement dated March 20, 19 91 , entered into a contract with Owner, for <br />(Here insert full name, address and description of project) <br />Orange County 911 Center Expansion <br />SR 1732, New Hope Church Road, Orange County, N.C. <br />in accordance with Drawings and Specifications prepared by (Here insert full name and address or legal title of ArcNitecil <br />George M. Smart Architects, Inc. <br />113 N. Boylan Avenue <br />Raleigh, N.C. ,27603 <br />which contract Is by reference made a part hereof, and is hereinafter referred to as the Contract. <br />AIA DOCUMENT A311 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND • AIA 9 ' <br />FEBRUARY 1970 ED. • THE AMERICAN INSTITUTE OF ARCHITECTS, 171i %,Y. AVE., N.W.. WASHINGTON, D. C. 20006 <br />