Browse
Search
Agenda - 03-20-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 03-20-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:42:13 AM
Creation date
11/8/2017 10:33:08 AM
Metadata
Fields
Template:
BOCC
Date
3/20/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. 1.5 The Drawings are as follows, and are dated 2 8 January 19 91 ... unless a different dace is shown below: <br />(Huber list the Drawings here or refer to an exhibit atla[hed to this Agreement.) <br />Number Title Date <br />C- 1 .......... Cover Sheet 28 January 1991 <br />A- 1 .......... Site Plan and Site Details of <br />A- 2 ........... Foundation Plan, Floor and Roof Framing Plan " <br />A- 3 .......... Basement Plan, Room Finish Schedule, and <br />9.1.6 The Addenda, if any, are as follows: <br />Number Date <br />1 <br />February 13, 19.91 <br />Pages <br />6 <br />F <br />Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requiremenrs :rl',Ic <br />also enumerated in this Article 9. <br />AIA DOCUMENT A101 - OWNER - CONTRACTOR AGREEMENT - TWELFTH EDITION - AIA* - 01987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W„ WASHING? "ON, D.C. 200W A101 -1987 7 <br />Door Schedule of <br />A- 4 <br />.......... First Floor Plan and Interior Elevations of <br />A- 5 <br />.......... Reflected Ceiling Plans and Exterior <br />Elevations of <br />A- 6 <br />.......... Building Section and Miscellaneous Details it <br />A- 7 <br />.......... Building Section and Miscellaneous Details if <br />P- 1 <br />.......... Demolition Plans -- Plumbing to <br />P- 2 <br />.......... First Floor Plan - Plumbing,.Riser Diagrams <br />Fixture Schedules " <br />P- 3 <br />.......... Basement Floor Plan - Plumbing " <br />M- 1 <br />.......... Demolition Plans - Mechanical " <br />M- 2 <br />.......... First Floor Plan - Mechanical " <br />M- 7 <br />.......... Basement Plan - Mechanical and Equipment <br />Schedule " <br />.E- 1 <br />.......... Demolition Plans - Lighting " <br />E- 2 <br />.......... Demolition Plans - Power " <br />E- 3 <br />.......... First Floor Plan - Lighting and Fixture <br />Schedule " <br />E- 4 <br />.......... Basement Plan - Lighting <br />E- 5 <br />.......... First Floor Plan - Power and Panel <br />Schedules " <br />E- 6 <br />.......... Basement Floor Plan -- Power and Riser <br />Diagram <br />9.1.6 The Addenda, if any, are as follows: <br />Number Date <br />1 <br />February 13, 19.91 <br />Pages <br />6 <br />F <br />Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requiremenrs :rl',Ic <br />also enumerated in this Article 9. <br />AIA DOCUMENT A101 - OWNER - CONTRACTOR AGREEMENT - TWELFTH EDITION - AIA* - 01987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W„ WASHING? "ON, D.C. 200W A101 -1987 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.