Browse
Search
Agenda - 03-20-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 03-20-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:42:13 AM
Creation date
11/8/2017 10:33:08 AM
Metadata
Fields
Template:
BOCC
Date
3/20/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ir! <br />ARTICLE 5 <br />PROGRESS PAYMENTS <br />5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the <br />Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and <br />elsewhere in the Contract Documents. <br />5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as <br />follows: <br />The Progress Payment Date shall be the 25th of each month. <br />5.3 Provided an Application for Payment is received by the Architect not later than the f i r s t - - - ..... . <br />• • . . ................... day Of a month, the Owner shall make payment to the Contractor not later than <br />the fifteenth - - - - - - - . - - . day of the same ... month. If an Application for Payment is received by the <br />Architect after the application date fixed above, payment shall be made by the Owner not later than forty five .... <br />.........days after the Architect receives the Application for Payment. <br />5.4 Each Application for Payment shall be based upon the Schedule of values submitted by the Contractor in accordance with <br />the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of theL Work <br />and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This Schedule, <br />unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br />5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period <br />covered by the Application for Payment. <br />5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: <br />5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage <br />completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the <br />Schedule of Values, less retainage of ten ...... ............................... percent <br />( . . . . . 10 ... %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be <br />included as provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by <br />Change Order; <br />5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably scored at the <br />site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably .stored off the <br />site at a location agreed upon in writing), less retainage of ten .............. . <br />percent( ..... 10 ... %)� .................... . <br />5.6.3 Subtract the aggregate of previous payments made by the Owner; and <br />5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Para- <br />graph 9.5 of the General Conditions. <br />5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following <br />circumstances: <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to one hundred <br />Sum, less such amounts as the Architect shall determine for incomplete. Work and unsettled .clai ss; and °�O) of the Contract <br />5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional <br />amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions, <br />5.8 Reduction or limitation of retainage, if any, shall be as follows: <br />(If it is intended, prior to Srrbsta)0tiat Conrpletiorr of rbe entire Wrork, to reduce or limit the rerainage resrdrirrg from the per-eerrtrnges insrr -red in Subpara- <br />xrrrpbs 5.6.1 and 5 -6.2 aboee, annd this is not eaplataed etsemberr be The Contract Do[runents. insert heir prnr•isionrs for surf reclrrction or timitatiun.) <br />AIA DOCUMENT A101 - OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION - AIA° • G�' 1087 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE. N.W., WASHINGTON, D.t;. Wxx; A101 -1987 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.