Orange County NC Website
3 <br />ARTICLE 4 <br />CONTRACT SUM <br />4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract SUM !of <br />two hundred seventy six thousand seven hundred. .........:........Dollars <br />,S 2�G�700 .00 .......................) j P n- <br />sub subject to additions and deductions as provided in the Co <br />tract ocuments. <br />4.2' The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br />hereby accepted by the Owner: <br />(State the numbers or other identification of accepted alternates, If decisions on other alternates are to be made by the Owner subsequent to the execution! of <br />this Agreement, attach a schedule of such other alternates sbou-ing the amount for each and the date until which that amount is valid.) <br />Alternate No. A -1: Install 2" asphalt concrete on driveways & <br />parking areas over 8" stone base. Stone <br />Base is Base Bid. <br />Alternate No. A -2: Install folding partitions in Meeting Room 101,as <br />specified in Section 10655. <br />F <br />4.3 Unit prices, if any, are as follows: <br />Trenching in rock ............ ....................$125.00 /cu. yd. <br />Rock excavation ... ..............................$ 50.00 /cu. yd. <br />Unsatisfactory soil excavation /backfill ......... $ 14.00/cu. yd. <br />Concrete footings .............................. .$100.00 /cu. yd. <br />AIA DOCUMENT A101 - OWNER - CONTRACTOR AGRPEMENT • TWELFTH EDITION • AIAO • C1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NFW Y0RK AVENUE, N.W., WASHINGTON. D.C. 20006 A101 -1987 3 <br />0 <br />