Browse
Search
Agenda - 03-20-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 03-20-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:42:13 AM
Creation date
11/8/2017 10:33:08 AM
Metadata
Fields
Template:
BOCC
Date
3/20/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.1.5 The Drawings are as follows, and are dated 2 8 January 19 91 ... unless a different date is shown below: <br />(Ettber list the Drawings here or refer to an exhibit <br />Number <br />atracbed to this Agreement.) <br />• Title <br />Date <br />C- 1 .......... Cover Sheet 28 <br />A- 1 .......... Sit e Plan and Site Details <br />January 1991 <br />of <br />A- 2...... <br />Foundation Plan, Floor and Roof Framing Plan <br />of <br />A- 3 <br />.......... Basement Plan, Room Finish Schedule, and <br />Door Schedule <br />A- 4 <br />.......... First Floor Plan and Interior.Elevations <br />A -5 <br />.......... Reflected Ceiling Plans and Exterior <br />Elevations <br />A- 6 <br />.......... Building Section and Miscellaneous Details. <br />„ <br />" <br />A-7 <br />.......... Building Section and Miscellaneous Details <br />" <br />P- 1 <br />.......... Demolition Plans - Plumbing <br />P -2 <br />.......... First Floor Plan -- Plumbing, Riser Diagrams <br />Fixture Schedules <br />P-3 <br />.......... Basement Floor Plan - Plumbing <br />M- 1 <br />.......... Demolition Plans - Mechanical <br />M- 2 <br />.......... First Floor Plan -- Mechanical <br />M-- 7 <br />.......... Basement Plan - Mechanical and Equipment <br />Schedule <br />„ <br />E- 1.......... <br />Demolition Plans -- Lighting <br />E-2 <br />.......... Demolition Plans -- Power. <br />.E- 3 <br />.......... First Floor Plan -- Lighting and Fixture <br />Schedule <br />„ <br />E- 4 <br />.......... Basement Plan - Lighting <br />E- 5 <br />.......... First Floor Plan - Power and Panel <br />Schedules <br />„ <br />E- 6 .......... Basement Floor Plan - Power and Riser <br />Diagram <br />„ <br />9.1.6 <br />The Addenda, if any, are as follows: <br />Number <br />Date <br />Pages <br />1 <br />February 13, 19,91 <br />6 <br />Portions of Addenda relating to binding rcduircrncnts are not part Of the Contract Documents unless the bidding requirements are <br />also enumerated in this Article 9. <br />AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELF rH EDITION • AIA® . 01987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 11-35 NEW YORK AVENUE. N.W., WASHINGTON, D.C. 20006 <br />, A101 -1987 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.