Orange County NC Website
ARTICLE 4 <br />CONTRACT SUM <br />4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of <br />two hundred seventy six thousand seven hundred ................... Dollars <br />(S 2 700.00 b6 . ....................... ), subject to additions and deductions as provided in the Con. <br />tract ocrument. <br />4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br />hereby accepted by the Owner: <br />(State the numbers or other identification of accepted alternates_ if decisions on otber alternates are to be made by the Owner subsequent to the execution of <br />ibis Agreement, attach a schedule of sucb other alternates showing the amount for eacb and the date until wbicb that amount is valid.) <br />Alternate No. A -1: Install 2" asphalt concrete on driveways & <br />parking areas over 8 "' stone base. Stone <br />Base is Base Bid. <br />Alternate No. A--2: Install folding partitions in Meeting Room 101 as <br />specified in Section 10655. <br />4.3 Unit prices, if any, are as follows: <br />Trenching in rock ............ ...................$1.25.00 /cu. yd. <br />Rock excavation ............. ....................$.50.00 /cu. yd. <br />Unsatisfactory soil excavation /backfill ......... $ 14.00 /cu. yd. <br />Concrete footings ........... ....................$100.00 /cu. yd. <br />AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIAO • ©1987 <br />THr: AM1iKICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N_W., WASHINGTON. D.C. 20006 A101 -1987 3 <br />