Browse
Search
Agenda - 03-20-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 03-20-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:42:13 AM
Creation date
11/8/2017 10:33:08 AM
Metadata
Fields
Template:
BOCC
Date
3/20/1991
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), <br />Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents Listed in this Agreement and <br />Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached <br />to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and <br />supersedes prior negotiations, representations or agreements, either written or oral, An enumeration of the Contract Documents, <br />other than Modifications, appears in Article 9. <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in <br />the Contract Documents to be the responsibility of others, or as follows: <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of <br />this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice <br />to proceed issued by the Owner. <br />(insert the date of comunerrcemtent, if it differs frown The dare of Ibis Agreement or, if applicable, state tbal the dale will be fixed in a notice io proceed) <br />The date of commencement of work will be established at a later date <br />with a Notice to Proceed.issued by the Owner. <br />Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the <br />Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens <br />and other security interests. <br />3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than <br />(Insert the calendar dale or m mrber of calenelar clays after rbe elate of canrnrewrcemrenr. Also insert any rrguiren:ents jar earlier Substarrtiai Completion ofcer- <br />rain portions OJ the trrw* if not st«red clseu'bere to the Contract Documents -) <br />225 Calendar days after the date of commencement established in the <br />Notice to Proceed. Refer to Addendum No. 1, Project Manual, for <br />phased work sequence. <br />— "� "' --- <br />, subject to adjustments of this Contract Tine as provided in the Contract Documents. <br />(Insert provistons. tJ « ), fur lhlrrtdatcr! deonagec rcN«ting to frrilur-c to Complete on linre.f <br />Contractor shall be assessed $100.00 per calendar day for liquidated <br />damages for failure to complete the project on time . <br />AIA DOCUMENT A101 • OWNER.CONTRACTOR AGREEMENT • TWELFTH iiDITION • A10 • ©1987 i <br />THE AMERICAN iNsT11'I I'rr OF ARC111TEC;'rS, 1'55 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20 06 A101 -1987 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.