Browse
Search
Agenda - 02-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 02-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:24:38 PM
Creation date
11/8/2017 10:28:25 AM
Metadata
Fields
Template:
BOCC
Date
2/25/1991
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Neal C. Floyd & Associates, Inc. <br /> january 6, 1991 <br /> Robert Ayers, RLS <br /> Aysrs Surveying <br /> 2111 Old NC <br /> Chapel Hill , NC 27516 <br /> R0 33 acres; Old 96, Orange County; <br /> Colonial Plaza Office part <br /> Dear Bob , <br /> Enclosed you will find a preliminary soils map for the <br /> property on Old 86. The property has good soil resources <br /> for on-site waste disposal . The provisionally suitable soil <br /> was characterized by a 8 to 12 inch silt loam surface <br /> underlain by a reddish yellow clay subsoil . The depth <br /> ranged form 24 to 26 inches based on the depth to the C <br /> horizon. <br /> There appears to be no major impediments to development of <br /> the property for business andfor commercial use. Based on <br /> the preliminary sketch, it appears that the proposed lot <br /> arrangements are quite feasible. All the proposed lots have <br /> areas of provisionally suitable soil on them <br /> The major concern will be the wastewater flow per site which <br /> ultimately determines the system size. However , with <br /> commercial development wastewater flow can be scrutinized <br /> and water savings used—to substantially reduce flow. <br /> Reduced flows can help to maximize useable areas. <br /> To prociedg I recommend that the center line of the roads <br /> and lots be flagged . At this time, system layouts can be <br /> done to finalize the sites especially On lots 9, 10, 85 and <br /> 3. Secondly, the maximum wastewater flows Per jot can be <br /> determined , thus allowing an accurate assessment of each <br /> lot ' s potential . <br /> If you have any questions ,or concerns, please contact me. <br /> . . Sincerely, <br /> Neal C. Floyd <br /> Soil Scientist <br /> 8108 BENTWOOD PLACE RALEIGH, NORTH CAROLINA 27615 919-870-7865 <br />
The URL can be used to link to this page
Your browser does not support the video tag.