Orange County NC Website
calculated. according to procedures-10 the United States D artment of Agdculture Soil <br /> Conservation Service's National En neering Field Manual for Conservation Practices or <br /> according to Rrocedures ado ted -bL any other a Mc of s state r the United States or <br /> any generally reeognized organization or association. <br /> COMMENTARY- The purpose of the change in the above paragraph is to require a higher level of <br /> sediment-trapping efficiency in High Quality Waters (refer to the definition in Section 3). For a number of <br /> reasons, however, this change has little practical impact in Orange County. (1) the amendment specifies <br /> improved performance for sediment ponds only,and, because of the type of development that usually occurs <br /> in these rural HQW, it would be unlikely that a sediment pond would be used; (2) existing standards in <br /> the Erosion Control Manual require both sediment ponds and sediment traps (which are most often used <br /> in these areas) to be designed and constructed to a greater efficiency than this amendment requires;and <br /> (3) the standards in the Manual apply not only to HQW but to all of Orange County and Chapel Hill. <br /> i ewly constructed open chani�Ls-in HQW zones shall be designed and constructed with side <br /> slopes no steeper than 2 horizonta_L to l vertical if a vegetative cover is used for stabilization <br /> unless soil conditions grmit a s r slo a or where the lo es are stabilized b win <br /> mechanical devices structural devices or other igMtable devices.jn-any event the angle for <br /> side slopes shall be sufficient to restrain accelerated erosion. <br /> e. Ground cover sufficient to restrain erosion must be Rrovided for an R2rtion of a land- <br /> disturbing activity ctivity in_a_HQW___zone within 15 working days or 60 calendardays, whichever <br /> period is shorter, following_coWletion of construction or development. <br /> COMMENTARK These amendments were adopted by the Legislature to provide additional'protection for <br /> High Quality Waters. The revision concerning sediment ponds in Section 8 (d) (1) is a change proposed <br /> by the staff`. "Sediment pond"is used instead of'sediment basin"because it is the term used in the Erosion <br /> Control Manual. <br /> Section 9 Stormwater Outlet Protection <br /> Protection aw Stream. Channels <br /> COMMEN!ARY.- To clarify the intent of this section, the title has been changed. <br /> 10 year storm after developumt 9WI no' Stentu of- <br /> or <br /> (ii) the velocity in the receiving wateremrse dekwmiwA for the '() YeN Ste'M F"01 to <br /> development` <br /> COIfldFIVTARY.- The text above will be deleted and replaced by the text below. <br /> b. Control of Velocity. <br /> Persons shall plan and conduct land-disturbing activity so that the post-construction velocity of the 10- <br /> 5 1-15-91 <br />