Browse
Search
Agenda - 02-25-1991
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1991
>
Agenda - 02-25-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 2:24:38 PM
Creation date
11/8/2017 10:28:25 AM
Metadata
Fields
Template:
BOCC
Date
2/25/1991
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Conducted by local govermments, <br /> (5) Funded in whole or in part by the State or the United States. <br /> COMMENTARY.• This change is proposed by the staff. The reference to the specific statute will be added. <br /> Section 7 Basic Control Objectives <br /> sedimmWim control plan are . An Erosion and Sedimentation Control Plan may_be disapproved pursuant <br /> to Section 18 of this ordinance if the glan fails to address the followin control-objectives: <br /> COHMENTARD This amendment to the first paragraph in this section will make it clear that plan <br /> approval can be denied if the objectives in Section 7 are not met. <br /> b Plan for Erosion Cont—ml - Design the develo meat and gMpare the site plan so that the necessa <br /> sediment-=ping devices and erosion control measures can be accommodated and are accessible for <br /> maintenance and removal. Observe the r uirements and standards in Oran a Coun 's Soil Erosion and <br /> Sediment Control Manual. <br /> COMMENTARY- This is an amen&nent proposed by the staff`. The purpose is to ensure that erosion control <br /> is considered and incorporated into the site design during the early stages of planning the development and not <br /> left as an afterthought. A plan can be denied when erosion control standards cannot be met because of a <br /> conflict with the site design. This paragraph will be inserted in the text and the letters of the following paragraphs <br /> adjusted. <br /> Section 8 Mandatory Design and Performance Standards for <br /> Land-Disturbing Activity <br /> No land-disturbing activity subject to the control of this ordinance shall be undertaken except in accordance <br /> with the following mandatory standards: <br /> a. Buffer Zone <br /> ?fo land disturbing wtivity shaff be permitted in proximity to a take at nahnal watercourse unless a <br /> buffer zone is piovided aieng the n2igin of the watereourse of sufficient width to eonfm visible si4tation <br /> &at this mbnetiou shall not a*y to land disturbing activity in em2neation with the eenstrwtien a <br /> facilities to be lo=ted on, ever, or mdet it bim at nattual wateramrser <br /> 1. No land-disturbing Lgfiviij during nods of construction or rovement to land shall be germi tted <br /> M Rroximily to a lake or, natural watercourse unless a buff" zone is rovided along the mar in of <br /> the watercourse of sufficient width to confine visible silts 'on within the twee -five Rercent 25% <br /> of the buffer zone n the land isturbin activi . Waters that hav been classified as trout <br /> w tens by the Environmental Management Commission- shall have An undisturbed buffer zone 25 <br /> feet wide or of sufficient width to confine visible siltation within the twenty-five percent (25%) of <br /> the buffer zone nearest the land-disturbing activity.whichever is greater. Provided however, that <br /> the County may anDrove Rlans which include land-disturbing activily alone trout waters when the <br /> duration of said disturbance would be temporary and the extent of said disturbance would be <br /> minimal. This subdivision shall n t Boll to a-land-disturbing activily in gogunection with the <br /> construction of facilities to be located on over, o er a lake or natural watercourse. <br /> 2. The 25 foot minimum width for an undisturbed buffer zane ad' t to desi ted trout wat shall <br /> be measured horizontally from the Wg of the %nk <br /> 3. Where a tem ra and minimal disturbance is Rgrmi tted as an exception by Section 8 a 1 of <br /> 3 1-15-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.