12 <br />project. All widening can be accomplished symmetrically within the <br />existing 100 -foot right -of -way with possible construction easements <br />required at certain locations. Bridges at Back Creek and at Haw <br />Creek would require widening to accommodate the proposed cross <br />section. It is recommended a new bridge be built to replace Bridge <br />No. 11 at Haw River. <br />The recommended cross section for Section B, from SR 2138 to SR <br />1100, where the roadside is lightly deveT'ope is a 4 -lane divided <br />section with two, 24 -foot pavements and a 46 -foot minimum median <br />width on an estimated 200 -foot right -of -way. Widening should be <br />accomplished on the north side of the existing road. A new bridge <br />would parallel the existing bridge at Cane Creek. <br />Section C extends from SR 1100 to the Chapel Hill'Bypass <br />project terminus. The recommended cross section is a 4 -lane divided <br />section with two, 24 -foot pavements and a 46 -foot minimum median <br />width on an estimated 200- foot right -of -way, with all widening to <br />be accomplished on the north side. The recommended 4 -lane divided <br />section should taper at the project terminus to match the proposed <br />cross section for the Chapel Hill Bypass project (two, 24 -foot <br />pavements with curb and gutter, divided by a 21 -foot raised median). <br />These recommendations are consistent with the anticipated traffic <br />volumes, the development in the project area, and the function of the <br />route. <br />The estimated costs of the recommended improvements are as follows <br />(residential and business relocations are indicated in parentheses for <br />Sections B and C): <br />Length Construction <br />(miles) Cost <br />Section <br />A <br />4.0 <br />58,200,000 <br />Section <br />B <br />8.0 <br />$9,000,000 <br />Right -of -Way <br />Cost <br />S 700,000 <br />(utilities only) <br />$ 9,500,000 <br />(56 relocatees) <br />Total <br />Cost <br />$ 81900,000 <br />$18,500,000 <br />Section C 8.0 58,800,000 $12,000,000 520,800,000 <br />(48 relocatees) <br />The total cost of the proposed project (including all sections) is <br />548,200,000. Cost estimates were prepared by the Preliminary Estimate <br />ngineer an the Right- of- Way.Branch. <br />If staging of the total project length is desired for funding <br />reasons, Section A should be the first stage, because no right -of -way <br />costs would be incurred, it connects with an interstate highway, and it <br />serves higher volumes of traffic. Section C should be the second stage, <br />since it would tie into the planned NC 54 Chapel Hill Bypass widening <br />project and also serves higher volumes of traffic. Section B is recom- <br />mended to be the third stage since it carries the lowest volume of <br />traffic. <br />