Browse
Search
Agenda - 12-18-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 12-18-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:12:19 AM
Creation date
11/8/2017 10:08:46 AM
Metadata
Fields
Template:
BOCC
Date
12/18/1990
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J <br />RICHARD SEARLE LOTWIN. D.P.M. 3 <br />PoD1ATRIC MEDICINE AND SURGERY <br />R �D <br />October 23, 1990 <br />Ms. Emily Crudup, ASLA <br />Orange County Planning Department <br />306F Revere Road <br />Hillsborough, NC 27278 <br />RE: Searle Farms Preliminary Plat Time Extension Request <br />Dear Ms. Cru -dup: <br />Pursuant to your letter dated October 8, 1990, I would at this time request a one- <br />year time extension for the preliminary plat approved for Searle Farms. I have outlined <br />the reasons for the time request as follows. <br />As developers of the property, we are not prepared at this time to submit an <br />application for Final Plat approval. The current status of the project is that we are <br />continuing to proceed to market the property and seek to resolve the conditions attached <br />with the Preliminary Plat approvals by the Orange County Commissioners dated December 4, <br />1989. We are requesting the time extension as per Option 2 of Section III D -2 of the <br />Orange County Subdivision Regulations. <br />We have proceeded with due diligence in seeking to meet these requirements, but due <br />to site conditions with obtaining additional approvals and other circumstances beyond <br />our control, we will need additional time. <br />A well was dug at the location indicated on the plan; however, water was found at <br />sufficient pressure. Thus, approvals must be obcained from the State to locate a new <br />well on the sice. The staking of the roads and lots was accomplished for engineering <br />purposes and some general site improvements were made to the community area. <br />We continue to feel that the development of the project at the planned layout and <br />density supports the County's goal of preserving open space and the natural beauty of <br />the site. Over 40 percent of the site will remain as open space. Representatives of <br />the Triangle Land Conservancy visited the site last] uly to review the portion of land <br />which has been preliminarily approved to be managed by the TLC. <br />Mr. Larry Miller, formerly the agent for Searle Farms, will no longer be <br />representing the project or associated with the property. I have pursued other <br />alternatives in seeking to develop the project, however, as I am sure you are aware, the <br />current economic conditions have made it difficult to market the property. We have <br />experienced a time delay with Mr. Miller's removal from the project development and we <br />anticipate this to be resolved shortly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.