Browse
Search
Agenda - 11-05-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 11-05-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:08:25 AM
Creation date
11/8/2017 9:59:42 AM
Metadata
Fields
Template:
BOCC
Date
11/5/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/�IID�D Ir�� <br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: November 5, 1990 <br />SUBJECT: Old Courthouse Landscaping Capital Project <br />DEPARTMENT Budget, Public Works <br />ATTACHMENT(S) <br />Proposed Capital Project Ordinance <br />Action Agenda <br />Item No.. -� <br />PUBLIC HEARING YES NO -X_ <br />INFORMATION CONTACT <br />Rod Visser, ext 2450 <br />Wilbert McAdoo, ext 2626 <br />TELEPHONE NUMBER <br />Hillsborough 732 -8181 <br />Chapel Hill 968 -4501 <br />Mebane 227 -2031 <br />Durham 688 -7331 <br />PURPOSE: To approve a change order to the contract awarded to C.C. <br />Woods Construction Company to authorize planned construction for <br />Phase II of the Old Courthouse Landscaping Project. <br />BACKGROUND: At the September 4, 1990 meeting, the Board of <br />Commissioners approved a contract with the C.C. Woods Construction <br />Company in an amount not to exceed $50,000. This contract covered <br />Phase I construction work under the Old Courthouse Landscaping Project <br />and additional work that could be performed within the funding <br />limitation. <br />The contractor has offered to undertake Phase II construction for <br />$23,950, a savings of $11,538 from the amount originally bid. This <br />construction work would, among other elements, include repair of the <br />Churton Street sidewalk, which was the County's second most significant <br />liability concern associated with the project. The offer is valid for <br />one week's time, at which point the contractor may withdraw it if <br />business picks up. <br />An additional appropriation of $18,852 would be needed to cover <br />construction and tree plantings included in Phase II. It is <br />recommended that these funds be advanced from the project allocation of <br />$36,000 planned for 1991 -92 in the CIP. The total planned project cost <br />at this time would not increase from the CIP total of $125,000. A <br />summary of pertinent figures is reflected below: <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.