Orange County NC Website
SCHEDULE K <br />Non - Residential /Commercial Mechanical <br />Commercial Cooling (with separate distribution-system, including <br />installation of a complete cooling system with the distribution <br />system, condenser, receiver, cooling tower, or evaporative <br />condenser coils and air handling units, etc.) <br />First Unit <br />Each additional unit <br />Replacement of a system <br />40.00 <br />10.00 <br />40.00 <br />Commercial Heating (Installation of a heating system including <br />boiler, furnace, duct heater, unit heater, air handling units and <br />air distribution system, etc.) <br />First Unit <br />Each additional unit <br />Replacement of a system <br />40.00 <br />10.00 <br />40.00 <br />5E <br />Commercial Heating and Cooling (with combined system including the <br />distribution system, boiler, furnace, ductwork, etc.) <br />First Unit <br />Each additional unit <br />Replacement of a system <br />40.00 <br />10.00 <br />40.00 <br />Commercial ventilation and Exhaust Systems (includes fans, blowers <br />and duct system for removal of dust, gases, fumes, vapors, etc.) <br />One system <br />Each additional system <br />Hood fan commercial type cooking equipment <br />Commercial range or grill (each unit) <br />Deep fat fryer <br />Oven <br />40.00 <br />10.00 <br />20.00 <br />20.00 <br />20.00 <br />20.00 <br />