Orange County NC Website
55. <br />SCHEDULE I <br />Plumbing <br />New Construction or Fixture Replacement <br /># Fixtures <br />1 7.00 <br />10.00 <br />2 <br />2 14.00 <br />17.00 <br />4 <br />4 21.00 <br />6 and over 21.00 <br />+ $4.00 /Fixture <br />Mobile /Modular Home 16.00 <br />SCHEDULE J <br />Residential Mechanical <br />Any covered ductwork or component 60.00 <br />(Each .system) <br />Any exposed ductwork or factory assembled component 40.00 <br />(One system) <br />Installation of each additional system 10.00 <br />Replacement of one system 40.00 <br />Mobile /Modular Home 16.00 <br />Multi- Family /Exposed ductwork 40.00 <br />(Per dwelling unit) <br />Multi- Family /Covered ductwork 60.00 <br />(Per dwelling unit) <br />