Orange County NC Website
r <br />54 <br />SCHEDULE F <br />Miscellaneous Electrical <br />Temporary Service <br />60 Amp 20.00 <br />60A - 100A 20.00 <br />Mobile /Modular Home 22.00 <br />Sign Inspections 20.00 <br />Each Gasoline Pump (All Pumps) 20.00 <br />Load Control Device 20.00 <br />(Per Dwelling Unit or Commercial Establishment) <br />Miscellaneous Inspections 20.00 <br />Each Extra Trip 20,00 <br />SCHEDULE G <br />Electrical Service Changes <br />Single Phase <br />30--50 Amp 20.00 <br />60 -100A 26.00 <br />125 -200A 33.00 <br />400A 39.00 <br />Three Phase <br />20--50 Amp 26.00 <br />60 -100A 33.00 <br />150 -200A 39.00 <br />400A 52.00 <br />SCHEDULE H <br />Electrical Service <br />Single Phase <br />Three Phase <br />30 -50 Amp <br />20.00 <br />26.00 <br />.60A <br />26.00 <br />26.00 <br />70A <br />33.00 <br />33.00 <br />100A <br />33.00 <br />33.00 <br />125A <br />39.00 <br />39.00 <br />150A <br />46.00 <br />65.00 <br />200A <br />52.00 <br />78.00 <br />300A <br />65.00 <br />91.00 <br />400A <br />78.00 <br />117.00 <br />600A <br />98.00 <br />130.00 <br />800A <br />130.00 <br />195.00 <br />1000A <br />195.00 <br />260.00 <br />1200A <br />260.00 <br />325.00 <br />1400A <br />293.00 <br />390.00 <br />1600A <br />325.00 <br />520.00 <br />Over 1600A <br />33.00/100A <br />52.00/100A <br />