Browse
Search
2017-605-E Arts - David Hinkle for construction of Gold Park Bee Hotel
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-605-E Arts - David Hinkle for construction of Gold Park Bee Hotel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 10:22:48 AM
Creation date
11/3/2017 9:34:58 AM
Metadata
Fields
Template:
Contract
Date
10/10/2017
Contract Starting Date
10/10/2017
Contract Ending Date
11/4/2017
Contract Document Type
Contract
Amount
$3,000.00
Document Relationships
R 2017-605-E Arts - David Hinkle for construction of Gold Park Bee Hotel
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:OFEF1983-CF97-41 B4-A62D-85E8210991 DF <br /> the rain shield. Rooms should be in varying sizes to accommodate the varying sizes <br /> and preferences of native bees. Any wooden openings to the rooms should be sanded <br /> and smooth. <br /> • Not contain any paint, sealant or synthetic materials, or natural materials that are <br /> harmful or known pollinator deterrents <br /> • Be mounted on a stand at least 2'off the ground <br /> • Be securely mounted and able to withstand flooding <br /> • Be maintained for three years. As a precaution against transmitting disease, it is <br /> recommended that the "rooms" be replaced after each spring, following the hatching <br /> of pollinator eggs contained in the hotel. <br /> Budget: <br /> Funding for the bee hotel is provided by OCAC, the Town of Hillsborough and Hillsborough <br /> Development Tourism Authority. A budget of $3,000 must cover all associated costs of the <br /> project, including but not limited to design, fabrication, materials, labor, transportation, <br /> insurance, and installation of the art feature. <br /> The selected artist will receive a contract for design, fabrication, installation and <br /> maintenance services from the OCAC. The artwork shall be owned by the Town of <br /> Hillsborough, NC. The artist shall retain copyright, and must allow Orange County, OCAC, <br /> the Town of Hillsborough, the Hillsborough Arts Council and the Hillsborough Tourism <br /> Development Authority permission to use images for educational and promotional <br /> purposes. <br /> Eligibility: <br /> The project is open to artists living in North Carolina, age 18 and over, regardless of race, <br /> creed, color, sex, sexual orientation, gender identity, pregnancy, age, religion, political <br /> affiliation or beliefs, national origin, or handicap, unless a bona fide occupational <br /> qualification exists. <br /> RFQ Selection Process: <br /> A review committee will evaluate all submittals and select the artist based on his/her <br /> application. In the event that the committee does not reach a decision in the first round of <br /> applications, finalists may be asked to present to the committee in person. <br /> Required Submission Materials: <br /> • Statement of interest, including relevant past projects/experience, as well as <br /> knowledge of pollinator habitats and best practices <br /> • Project budget including estimated costs for design, fabrication, materials, labor, <br /> transportation, insurance (until the point of completed installation), installation and <br /> maintenance of the bee hotel <br />
The URL can be used to link to this page
Your browser does not support the video tag.