Browse
Search
Agenda - 11-14-2017 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-14-2017 - QPH
>
Agenda - 11-14-2017 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2017 8:40:32 AM
Creation date
11/3/2017 9:30:38 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2017
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes 11-14-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br /> Staff is requesting the following modifications to this exhibit: <br /> i. Denote the location of all utility lines (i.e. sewer, water, reclaimed <br /> water, stormwater management, electrical service, cable, <br /> telephone, etc.) on the map. <br /> As part of this modification please provide a key/legend detailing: <br /> a. Existing infrastructure in place, <br /> b. What infrastructure is expected to be constructed by <br /> Orange County/Town of Hillsborough, and <br /> c. New infrastructure serving the project. <br /> As part of this requirement, staff will need detailed <br /> information on proposed line types, sizes, <br /> anticipated construction, etc. <br /> ii. Denote the anticipated location of sidewalks to assist staff <br /> ascertain if there will be any conflicts with utility location. <br /> iii. The map will need to be modified to include the detailed design <br /> calculations for the project indicating that the proposed 12 inch <br /> utility line is sufficient for expected development and <br /> associated/estimated density for the project. <br /> iv. Include a note on Exhibit 2 indicating: `All onsite utilities shall be <br /> underground unless approved by the Board of County <br /> Commissioners'. <br /> v. Indicate connection points to various utility lines. <br /> vi. Denote the location of any anticipated/planned utility infrastructure <br /> (i.e. pump stations, etc.). Currently there is One (1) pump station <br /> denoted on the plan within the `Commercial' development area. <br /> With respect to this pump station please provide the following <br /> detail: <br /> a. Size and capacity of the station, <br /> b. Design calculations, <br /> c. Ability to serve associated/estimated density for the <br /> project. <br /> As an aside staff is concerned over the proposed pump stations <br /> proximity to an existing stream buffer and overhead power line <br /> easement. Additional detail concerning potential impacts and <br /> proposed mitigation options will need to be included on the revised <br /> Exhibit. <br /> vii. Please include the following information on the revised Exhibit: <br /> a. Provide detail on anticipated fire flow for the <br /> proposed utility lines with detail on how same will <br /> support the project. As a general reminder fire flow <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.