Orange County NC Website
J.q I , <br />B. STATE PERMITS REQUIRED <br />1. Does the project involve the mining of earth products? <br />If so, how many cubic feet of material are expected to be <br />excavated? <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? <br />Please attach map indicating expected extent of proposed <br />activity. <br />Z. Does the project involve generation or storage of hazardous <br />or toxic wastes, as identified by the Environmental <br />Protection Agency? (A listing of all hazardous materials is <br />available from the Planning Department) <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? <br />Volume? <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and air <br />quality in case of spills? <br />