Orange County NC Website
7 <br />July 31, 1990 <br />Mr. Sill Fripp <br />Re: Orange County Jail <br />Page 2 <br />4. Pass thru at door #105 (zoom 120): <br />221.00 <br />Subcontract price <br />Overhead and Profit (7$) <br />15.47 <br />Total item #4 <br />$236.47 <br />Total Change Order price <br />$236.00 <br />S. Catwalk at Mechanical room to top of slab <br />over rooms 201, 202 and 203: <br />As quoted <br />$231.00 <br />6. Removal of stoop at welded shut door <br />(old door #122): <br />535.05 <br />Labor w /insurance, etc. <br />Dump Truck (3 hours) <br />105.00 <br />Bobcat (4 hours) <br />120.00 <br />Compressor (2 days) <br />140.00 <br />15.00 <br />Dump fees <br />1 load of dirt <br />50.00 <br />Subtotal <br />965.05 <br />Overhead and Profit (15$} <br />144.76 <br />Total <br />$1,109.81 <br />Total Change Order price <br />$1,109.004 <br />Thank you for your assistance. <br />r^. a� <br />Sincerely# <br />RIGGS- HARROD BUILDERS, INC. <br />Douglas McKelvey, Estimator <br />DM/ ip <br />f J'00011 , <br />Iq <br />le I <br />