Orange County NC Website
CRIER -FRIPP ASSOCIATES, INC. <br />Architects and Engineers <br />09 May 1990 <br />GENERAL CONTRACT CHANGE 0 DER NO. GC--1 <br />EXPLANATION AND REASON FOR CHANGE: <br />ITEM ccurs front entrance walkway. off hise sectionetofls the <br />opening g <br />railing is <br />o <br />necessary for safety. <br />ADD ..........................$ 321.00 <br />ITEM N0. 2: New 8 -bed Dormitory Area -120 has existing combination of vinyl <br />asbestos painted and thistareaDrefinishedwi requested <br />thpai <br />to nted <br />I concur t <br />floor. <br />ADD..........................$ 814.00 <br />ITEM NO. 3: We requested the contractor to re -use existing brick removed at new <br />openings, however, the brick are so brittle they cannot be saved. This cost is <br />for new brick to match the existing. <br />ADD......................... 2.00 <br />Total this Change Order - Add S1.377-00 <br />77.00 <br />Respectfully submitted, <br />GRIER -FRIPP ASSOCIATES, INC. <br />William E. Fripp, Jr., AIA, PE <br />WEF,Jr.:dh <br />POST OFFICE BOX 11207 / 4108 PARK ROAD, SUITE 300 [28209] <br />CHARLOTTE, NORTH CAROLINA 28220 / [704] 527 -2514 / FAX [704] 527 -2516 <br />3 <br />