Browse
Search
Agenda - 08-21-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 08-21-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:10:58 PM
Creation date
11/1/2017 4:06:15 PM
Metadata
Fields
Template:
BOCC
Date
8/21/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.1 <br />*Amended <br />2 -1 -88 <br />13.2 <br />13.3 <br />* ARTICLE 13. TRAFFIC IMPACT STUDY <br />Purpose <br />A traffic impact study shall be required of zoning changes, <br />special use permits, and site plans as defined in this Articl <br />The study will enable Orange County to assess the impact of a <br />proposed zoning change, special use permit, or development on <br />the highway system when that system is at or near capacity or <br />safety problem exists. Its purpose is to insure that propose <br />developments do not adversely affect the highway network and <br />identify any traffic problems associated with access from the <br />site to the existing transportation network. The purpose of <br />study is also to identify solutions to potential problems and <br />present improvements to be incorporated into the proposed <br />development. <br />Conduct <br />a <br />U <br />he <br />to <br />A traffic impact study shall be prepared by a qualified <br />professional . traffic engineer and /or certified transportation <br />planner with previous traffic study experience. The procedures <br />and standards for the traffic impact study are set forth in <br />[Article] Section 13.4 of this Ordinance. <br />Prior to the Bre2aration of a traffic im act study, a sco in <br />meeting shall be held including the 21anning staff, the <br />aRRlicant, and the RreRarer of the study, The discussion at <br />this meeting should set the studY 2arMeters, including the <br />- - - - - - • -- %V <br />or- others- road links and intersectioas to be analyzed, <br />which analysis is to be erfo ed and other staff concerns. <br />to this meeting. <br />(The proposed amendments clarify the qualifications of the <br />professional performing the TIS and establish the need for a <br />pre -TIS conference). <br />Applicability <br />Except as described below a traffic impact study shall be <br />required for all zoning changes, special use permits, or si <br />plans that meet the following criteria: <br />zoning Changes: estimated average traffic generated by <br />uses permitted in the zone being applied for exceeds <br />800 trips /day or 100 triRs during the AM or PM peak-hour <br />of highway traffic. <br />[] = delete text <br />bold underline = add text <br />
The URL can be used to link to this page
Your browser does not support the video tag.