Orange County NC Website
2. By January 2, 1969 or within thirty (30) <br />days of receiving the Authorization to' <br />Construct whichever is later, begin <br />construction of the wastewater treatment. <br />facility. (met) <br />3. Complete construction of the wastewater <br />treatment facility on or before Elay 31, <br />1990. <br />4. comply with all effluent limits <br />contained in the 14PDES Perm-'t No. <br />NC0037869, at the either point Of <br />discharge (current or proposed) on or <br />before august 31, 1990. <br />5, Within 30 days of receiving encroachment <br />agreement (s) for the outf all ': ine , <br />submit plans and specifications for the <br />Authorization to Construct the cutfall <br />line which will move the discharge to <br />the proposed location on Stoney Creek. <br />6. Complete construct-Jon of the o:1tf a l l <br />line and begin discharging to the <br />proposed location on Stoney Cree }' <br />30 days of issuance o= the Au'tho== zctlOn <br />to construct. <br />7. Co: -tly ccnsj seen ,y with all <br />e= r_uert 1_r,<<ts contained in !:PrSS <br />78G9 ,^�u'r;ng t: ^.e 7-=.._.._ <br />of Sep:.erroer, , October, and NOve-i; De: <br />1990. Dote. failure Lo comply w =th ' :r — s <br />requirement w -ill result in the required <br />payment of the balance of the civil <br />penalty as outlined in Paragraph 2, <br />unless excused under Paragraph 5. <br />(c) During the time in which this Special Order by <br />Consent is effective, comply with the interim <br />e =fluent limitations contained in Attachment �. <br />The fclwowinc reflects only the limitations taG: <br />have been modified from NPDFS requirements by this <br />Order. <br />Effluent Monthly Weekly <br />Characteristics Units Average Average <br />BOD mg /l 200 300 <br />TES mg /l 300 400 <br />NF as N mg /1 45 60 <br />Diasolvec Oxygen mg /l No Limit No Lirr +i:. <br />Fecal Co`` -iform No Limit No Limit <br />