Orange County NC Website
efln�c 88U ��f, 624 <br />2. By January 2, 1989 or within thirty (30) <br />days of receiving the Authorization to" <br />Construct whichever is later, begin <br />construction of the wastewater treatment <br />facility. (met) <br />3. Complete construction of the wastewater <br />treatment facility on or before May 31, <br />1990. <br />4. Comply with all effluent limits <br />contained in the NPDES Permit No. <br />I4C0037869, at the either point of <br />discharge (current or proposed) on or <br />before August 31, 1990. <br />5, within 30 days of receiving encroachment <br />agreement(s) for the outf all *wine, <br />submit plans and specifications for the <br />Authorization to Construct the our-fall <br />line which will move the discharge to <br />the proposed location on Stoney Creek. <br />6. Complete construction of the outfall <br />line and begin discharging to the <br />proposed location on Stoney Creek wig - - -•• <br />30 days of issuance of the Authorization <br />to Construct. <br />7 . Comply cons seen t I with all <br />1_mits cc:itGined in ?;P" <br />er_Iuent �_ <br />Per�it ?,C. IrC0�C7Q�e�GLandG2v'OVei��� `. y <br />Of September, , <br />1990. Note: failure to comply with th -s <br />requirement will result in the required <br />payment of the balance of the civil <br />penalty as outlined in Paragraph 2, <br />unless excused under Paragraph 5. <br />(c) During the time in which this Special Order by <br />ConsenF is effective, comply with the interim <br />effluent limitations contained in Attachmen: The following reflects only the limitations - at <br />have been modified from NPDES requirements by this <br />Order. <br />Effluent Monthly Weekly <br />Characteristics Units Average Ave°� <br />mg /1 200 300 <br />TSS BOD5 mg /l 300 400 <br />NH as N mg /l 45 60 <br />Di� solved Oxygen mg /l No Limit No Limit <br />Fecal Col -form No Limit No Limit <br />