Orange County NC Website
2. By January 2, 1989 or within thirty (30) <br />days of receiving the Authorization to" <br />Construct whichever is later, begin <br />construction of the wastewater treatment <br />facility. (met) <br />3. Complete construction of the wastewater <br />treatment facility on or before May 31, <br />1990. <br />4. Comply with all effluent limits <br />contained in the NPDES Permit No. <br />NCG037869, at the either point of <br />discharge (current or proposed) on or <br />before August 31, 1990. <br />5. Within 30 days of receiving encroachment <br />agreement (s) for the outfall line, <br />submit plans and specifications for the <br />,u:.horization to Construct the outfall <br />line which will move the discharge to <br />the proposed location on Stoney Creeh. <br />6. Complete construc-�-J on of the out-fall <br />line and begin discharging to the <br />proposed location on Stoney Creed: wit in <br />30 days ar issuance of the Author_zat_cn <br />to Constru'ct. <br />7. Ca p'v ccnsi ste: tly with all final <br />e =f! cent li,;.its cent -inee in NPDE'S <br />p---;-: Nc. 1,,COC378E9 dur_nc -he <br />of September, October, and Nove,i;ber <br />1990. Note: failure to comply with this <br />requirement wi l result in the requireu <br />pavment of the balance of the civil <br />penalty as outlined in Paragraph 2, <br />un'ess� excused under Paragraph S. <br />(c) During the time in which this Special Order by <br />Consent _s effective, comply with the interim <br />efflue -z limitations contained in Attachment �.. <br />The r erlects only the limitations tr;Ft <br />have been moci =ied from NPDES requirements by z -is <br />Order. <br />Effluent Monthly Wee)-Iv <br />Characteristics Units Average r.veraae <br />BOD5 mg /1 <br />TES mg/ l <br />N as N mg /l <br />Di,?-solved Oxvgen mg /l <br />Fecal Col�form <br />200 300 <br />300 500 <br />45 60 <br />No Limit No Limit <br />No Limit No 7 imi It <br />