Orange County NC Website
27 <br />uwwn of Hulsborou <br />HILLSBOROUGH, NORTH CAROLINA <br />June 26. 1990 <br />Mr. Eddie Kirk <br />Orange County Planning Department <br />Hillsborough. N. C• 27278 <br />101 E. Orange Scree: <br />P.O. Box 429 <br />(919) 732 -2104 <br />r; <br />yr � D <br />Lc cZ�o 4 lJ <br />Dear Eddie: <br />This letter is to certify to your office that the utility <br />system which has been proposed for the expansion rovalhfromO °our <br />edge Hobile Home Park has received preliminary app that <br />Town Engineer. Hr. David Cain. He has certified previously <br />the capacity is available for the copy of his letter <br />provide to you dated <br />service to the proposed area. By <br />June 18. 1990, he has repeatevailablertofhandlen the <br />expansion. <br />reserve capacity a <br />(Although the January. 1987, letter is dealing with the water an <br />Elementary <br />sewer extension to the New Hope ry School. there are <br />y. after full buildout <br />figures stated which show that the capacit <br />of the w000dsedge Mobile Hoe ms Park. <br />rstill exists in the Pump <br />stations to handle the sc <br />The Town of Hillsborough withdrawnafromithe Eno voluntary <br />RiverThe <br />capaci- <br />ty use agreement for water to treat 3.0 mgd <br />water treatment plant presently has a capacity resent time. <br />but we are only treating about 1.5 mgd at the P <br />Under the Capacity Use Agreemebutwwe are <br />havelimited <br />outside •5source <br />withdrawal from the Eno River. or to purchase <br />agreement 'with the orange Waterhave noweroblemwiththe water <br />up to 2.0 mgd. Therefore, to 3,51 mgd. <br />capacity at the present time. We can sell up <br />The wastewater treatment plant has a 2.0 mgd capacity and we <br />slightly less than 1.0 mgd. Therefore the capacity is <br />are using <br />ment plant to treat the additional s- <br />available at the treat <br />charge. <br />There are two sewage pump stations that exist inhtave eo °dbe <br />edge Mobile Home Park. Altumpshtohhandlertheeadditional flow. <br />reworked to provide larger p <br />the remaining pump station at Woodsedge as well as others in the <br />relay - pumping <br />system have adequate capacity to provide for the <br />needs of this addition. The existing lines do have the reserve <br />capacity to handle the additional discharge. <br />The Board of Commissioners has also given their preliminary park. The <br />approval to the proposed expaandoanyfmodificationsoproposed for <br />final plans for the expansion <br />the pump station will have to be approved by the Board of Commis- <br />sioners before the improvements can be made. <br />