Browse
Search
Agenda - 08-06-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 08-06-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:21:15 PM
Creation date
11/1/2017 4:05:35 PM
Metadata
Fields
Template:
BOCC
Date
8/6/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
704
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ART CLUE 14.2 .33 SPECIF�ON FOR PLAN PREPARATION continued) <br />PLANNING <br />BOARD <br />RECOMMENDED <br />FINDINGS EVINCE SUBMITTED TO SUPPORT FINDINGS <br />0 inance Reouirements <br />a) Solid waste disposal x--Yes No <br />facilities <br />n) All free - standing and wall- —X—Yes No <br />mounted signs in accordance <br />with Article 9 of the Zoning <br />Ordinance <br />o) A landscape plan demonstrating ,x,Yes No <br />compliance with Article 12.3 of <br />the Zoning Ordinance <br />p) Existing contour lines (dashed) x-Yes No <br />and proposed contours (solid) at <br />5 -foot intervals with 10 -foot <br />contours bold. Where site <br />conditions warrant, 2 -foot <br />contours may be required <br />q) Retaining walls, tree wells, ^x`Yes No <br />or rip rap as part of the grading <br />plan <br />r) Streams, ponds, drainage ^xlYes No <br />ditches, swamps, ftoodway and <br />floodplain boundaries <br />Solid waste will be collected by <br />private contractor. <br />The entrance sign is indicated on <br />the site plan.. <br />A landscape plan has been submitted. <br />The property is presently wooded <br />and the applicant indicates there <br />will be minimal clearing. <br />Contour lines are indicated on the <br />site plan. <br />A grading plan will be submitted to <br />the Erosion Control Officer prior <br />to construction. <br />The site plan indicates there are no <br />streams, ponds or flood areas on the <br />property. Drainage ditches will be <br />determined by the Erosion Control <br />officer on the Erosion Control Plan. <br />15 <br />BOARD OF <br />COMMISSIONERS <br />FINDINGS <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />Yes No <br />s) Phase lines and numbers if —X—Yes No Phasing is not proposed. <br />the development is to be phased <br />
The URL can be used to link to this page
Your browser does not support the video tag.