Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully perform <br />said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. <br />The Surety hereby waives notice of any alteration or <br />extension of time made by the Owner. <br />Whenever Contractor shall be, and declared by Owner <br />to be in default under the Contract, the Owner having <br />performed Owner's obligations thereunder, the Surety <br />may promptly remedy the default, or shall promptly <br />1) Complete the Contract in accordance with its terms <br />and conditions, or <br />2) Obtain a bid or bids for completing the Contract in <br />accordance with its terms and conditions, and upon de- <br />termination by Surety of the lowest responsible bidder, <br />or, if the Owner elects, upon determination by the <br />Owner and the Surety jointly of the lowest responsible <br />bidder, arrange for a contract between such bidder and <br />Owner, and make available as Work progresses (even <br />though there should be a default or a succession of <br />defaults under the contract or contracts of completion <br />arranged under this paragraph) sufficient funds to pay the <br />cost of completion less the balance of the contract price; <br />but not exceeding, including other costs and damages <br />for which the Surety may be liable hereunder, the amount <br />set forth in the first paragraph hereof. The term "balance <br />of the contract price," as used in this paragraph, shall <br />mean the total amount payable by Owner to Contractor <br />under the Contract and any amendments thereto, less <br />the amount properly paid by Owner to Contractor. <br />Any suit under this bond must be instituted before <br />the expiration of two (2) years from the date on which <br />final payment under the Contract falls due. <br />No right of action shall accrue on this bond to or for <br />the use of any person or corporation other than the <br />Owner named herein or the heirs, executors, adminis- <br />trators or successors of the Owner. <br />Signed and sealed this 26th day of ,JUNE 1990 <br />BROWN BROTHERS PLUMBING & HEATING CO. ,INC-. <br />(Principal) - (5eal) <br />(Witness) <br />f' Jr, (Tide) <br />UNITED STATES FIDELITY AND GUARANTY COMPANY <br />(Surety) (Seal) <br />(Witness) (74 { <br />(Title) <br />BEVERLY S. DEL ATTORNEY —IN —FACT <br />AIA DOCUMENT A311 • PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND • AIA <br />FEBRUARY 1970 ED. • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D. C. 20006 Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.