Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />ORDER <br />AIA DOCUMENT G701 <br />Distribution to: <br />OWNER ❑ <br />ARCHITECT ❑ <br />CONTRACTOR ❑ <br />Fl ELD I-] <br />OTHER ❑ <br />PROJECT: Orange Co. Animal Shelter <br />(name, address) Airport Road <br />Chapel Hill, Nc <br />TO (Contractor): <br />F—Indicor <br />P.O. Box 29302 <br />Greensboro, NC 27492 <br />CHANGE ORDER NUMBER: 1 <br />INITIATION DATE: June 27, 1990 <br />ARCHITECT'S PROJECT NO: 018 <br />CONTRACT FOR: Mechanical <br />L J CONTRACT DATE: June 26, 1990 <br />You are directed to make the following changes in this Contract: <br />1. ADD thru wall HVAC unit in multi —task room. + $1100.00 <br />2. ADD Alternate No. 1 as shown on oontract documents dated <br />March 30, 1990 + 424.00 <br />3. ADD Alternate No. 2 as shown on contract documents dated <br />March 30, 1990 + 416.00 <br />TOTAL ADD $1940.00 <br />n <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) 0CKcn0aft0dKSbMbrKDDCg=) was . _ , $ <br />26, 262.00 <br />Net change by previously authorized Change Orders <br />$ <br />The (Contract Sum) prior to this Change Order was .......... $ <br />- -- <br />26, 262.00 <br />The (Contract Sum) will be (increased) <br />by this Change Order ....... <br />............................... $ <br />The new (Contract Sum) ( <br />1,940.00 <br />including this Change Order will be ... $ <br />The Contract Time will be <br />28,202.00 <br />(unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />( 0 ) Days. <br />George M. Smart Architects, Inc. I Authorized: e6UlU'►y <br />ARCHITECT CONTRACTOR wN <br />ORati+G6 <br />2 S`r ox <br />Address 113 N. Boylan Ave. Address Address <br />aft/ <br />Ralei 27 5 C . "soRou a <br />1 <br />BY <br />une , 1990 DATE 1 DATE t <br />q0 <br />AIA DOCUMENT G701 • CHANGE ORDER APRIL 1978 EDITION • AIA® © 1978 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK <br />AVE., N.W., WASHINGTON, D.C. 20006 <br />6701 — 1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.