Orange County NC Website
9.1.5 The Drawings are as follows, and :ire (hiied unless a different date is shown Ix10 v, : <br />(ritber liar aic Dranwigc b(•re w- refir <br />r(" :171 crbibir athrcbed «, Ibis Agreement,) <br />Number <br />Title <br />Date <br />C -1 <br />Cover Sheet <br />3 -30 -1990 <br />LS -1 <br />Site Plan & Details <br />3 -30 -1990 <br />A-1 <br />Floor Plan, Room Finish Schedule, <br />Door Schedule, Door & Window Types <br />3 -30 -1990 <br />A -2 <br />Building Elevations, Building <br />Section & Details <br />3 -30 -1990 <br />A -3 <br />Building Sections, Door & Window <br />Details <br />3 -30 --1990 <br />A -4 <br />Building Sections & Details <br />3 -30 -1990 <br />A -5 <br />Building Sections. Wall Sections & <br />Details <br />3 -30 --1990 <br />A -6 <br />Interior Elevations, Enlarged Plans <br />& Details, Reflected Ceiling Plan, <br />Roof Plan & Details <br />3--30 -1990 <br />S -1 <br />Foundation Plan & Details <br />3 -30 -1990 <br />S -2 <br />Roof Framing Plan <br />3 -30 -1990 <br />P -1 <br />Plumbing Plan <br />3 -30 -1990 <br />N-1 <br />HVAC Floor Plan <br />3 -30 --1990 <br />M -2 <br />Mechanical Details <br />3--30 -1990 <br />E -1 <br />Lighting Plan <br />3 -30 -1990 <br />E--2 <br />Power Plan <br />3 -30 -1990 <br />9.1.6 The Addenda, if any, are as follows: <br />Number Date Pages <br />1 April 19, 1990 9 <br />2 April 30, 1990 9 <br />3 May 17, 1990 1 <br />Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are <br />also enumerated in this Article 9. <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWELF141 EDITION • AIA® - 0C 1987 <br />THE AMERICAN INSTITUTE OFARCHITECTS, 1735 NEW YORK AVr_NUF,., N.VG'., WASHINGTON, D.C. 20006 A101 -1957 7 <br />