Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting the entire unpaid balance of the Contract Sum, shall he made by the Owner to the Contractor when ( I ) <br />the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconformin.p <br />Work ,1s provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarik- <br />survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall he made b' <br />the Owner not more than 0 days after the issuance of the Architect's final Certificate for Payment, or as follows: <br />ARTICLE 7 <br />MISCELLANEOUS PROVISIONS <br />7.1 Whcre referenccr is made in this Agreement to a provision of the General Conditions or another Contract DOCUment, the rcf- <br />erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br />7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stared below. or in <br />the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br />(Insert titre of interest agreed upon, if.arp,.) <br />(Ustuy latt,s and requirements antler the Federal 7-rrab in tending Act, shnilarstale and local consumer credil lairs anal otber regulations al the Utrrrer's and <br />Contractor ;s principal places q(business, the location of lbe Project and elsetebere may affect the t-alidity rrf this provision- /,egad adr'ice should be obtained <br />tvitb respect to deletions or modifications, and also regarding regirirentertts sue b as tnritten disc'losrrres or trairers.) <br />7.3 Other provisions: <br />ARTICLE 8 <br />TERMINATION OR SUSPENSION <br />8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions, <br />8.2 The Work may be suspended by the Ov: ner as provided in Article 14 of the Gencral Conditions. <br />AIA DOCUMENT A101 • OWNrR- CONTRACTOR AGREEMENT • TWELF11 I EDITION • AIA® • 901987 <br />THE AMEERICAN INSTITUTE OFARCHITLCTS, 17.45 NEw' 1'ORh AVENUE. N.W., W'ASHINCTON, I7.C. 20006 A101 -1987 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.