Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />-1 -hc Contric•t lkicunlCrtls ccr,sist of this ; \l;r c:rnent. Conditions of the Contract (General, Supplementary and other Conditions), <br />Drawings, tiperihcationc, Addenda issued prior to CXCCtl[ion of this Agreement, other documents listed in this Agreement and <br />,\9odific:ttiirns ISSUC(I after execution cif this Agl- cc111CIit; these form the Contract, anal are as fully a part of the Contract as if attached <br />to this Agrc:cmc;it or rcpeatcd hc; -On. l he• C,ontr:ic-t rcpresents the entire: and integrated agrcanent between the parties hereto and <br />supeisCdcs prior negntiatiuns, rrprc;cntaticnis or agreements. either Nvritten of oral. An enumeration of the Contract Dcxutnents, <br />other than :: \loditicatitm,, aphcar's i:I Allic'lc t). <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />'I -he Contractor shall Cxerute tale entire describt:d in the Contract Documents, except to the extent specifically indicated in <br />the Contract Docurnerlts ui be tile ccsponsibilit� of others, or as follows: <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of <br />this Agreement, as First wriuen above, unless a different date is stated below or provision is made for the date to be fixed in a notice <br />to proceed issued by the Owner. <br />(lusert the dale of canrinreacetiePlt, if it cliffer:+ front tloe flare of Ibis :igrecnu•rn or, if applicable, state that ilia dare trill be fixed in a rintice to proceed.) <br />The date of ctmrencement of work will be established at a later date with a Notice <br />to Proceed issued by the Owner. <br />Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the <br />Owner in writing not less than five clays before commencing the Work to permit the timely filing of mortgages, mechanic's liens <br />and other security interests. <br />3.2 'rile Contractor shall achieve Substantial Completion of the entire Work not later than <br />(Insert the calendar date or rriunher of e-ateiidar dgrc after lbe duet of c•onilnencenrent. AIso inser-r cal r r•equirerneiuts J'nr earlier substantial Gnrnplellar ojc'er <br />rain /nirliuns of floe Work. (/'Plot Stated elseieloere lot lbe C:onhneY Dociirneids.) <br />240 Calendar days after the date established in the Notice or Proceed. <br />subiect to acliustnients of this Contract Time as pi i-led in the (:onuact Documents. <br />(hiserr prrii isiurrs. i/' ait.i•. for ligaidated dtr109c. i'rlrtilig hi faiffire ru com/dele oPl fLn(") <br />The Contractor shall be assessed.$100.00 per day for liquidated damages for <br />failure to coWlete the project on time. <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWEILF -H EDITION • AIA'e • ©1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1'35 NEW PORK AVENUE:, WASI-ImcTON, D.C. 2exl06 A101-1987' 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.