Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE Distribution to: <br />ORDER OWNER <br />❑ <br />ARCHITECT <br />❑ <br />AIA DOCUMENT 6701 CONTRACTOR <br />❑ <br />FIELD <br />❑ <br />OTHER <br />❑ <br />PROJECT: Orange County Animal Shelter <br />(name, address) Airport Road <br />Charel Hill, T_SC <br />TO (Contractors): <br />I <br />L <br />The Resolute Building Co. <br />P.O. Box 3656 <br />Chapel Hill, NC 27515 <br />CHANGE ORDER NUMBER: 1 <br />INITIATION DATE: June 27, 1990 <br />ARCHITECT'S PROJECT NO: 018 <br />CONTRACT FOR: General Construction <br />J CONTRACT DATE <br />You are directed to make the following changes in this Contract: <br />1. ADD split ribbed block on east wall of kennel. <br />June 26, 1990 <br />+ $ 377.00 <br />2. ADD multi -task room as shown on contract docments dated <br />March 30, 1990 + 13,740.00 <br />3. ADD paving of front parking lot as shown on contract decu¢nents <br />dated March 30, 1990 + 2,809.00 <br />4. ADD Alternate No. 1 as shown on contract documents dated March <br />30, 1990. + 20,400.00 <br />5. ADD Alternate No. 2 as sharn on contract docummnts dated March <br />30, 1990. + 23,400.00 <br />TOTAL ADD $60,726.00 <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original ( Cost) was ........................... $ 190,195.00 <br />Net change by previously authorized Change Orders .... ............................... $ 0 <br />The (Contract Sum) prior to this Change Order was .......... $ 190,195,00 <br />The (Contract Sum) ) will be (increased) <br />by this Change Order . ............................... $ 60,726,00 <br />The new (Contract Sum) including this Change Order will be ... $ 250,921.00 <br />The Contract Time will be (unchanged) by ( 0 ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />thorized: aa <br />r M Smart Architects inc. Bui1din Comi an Vr & <br />ARCHITECT CONTRACTOR <br />Address an Ave. Address ress ! f <br />Ad <br />Raleigh, NC 27603 Chapel Hill NC 27515 U6 AP MC 9,? <br />BY BY <br />June 27, 1990 DA David F Anna, President A 0 - -.r <br />l i i 1y L2,�990 , ... D. TE � 9 _., <br />AIA DOCUMENT G701 • CHANGE ORDER APRIL 1978 EDITION I AIA'a @1978 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 —1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.