Orange County NC Website
ARTICLE 9 <br />ENUMERATION Of CONTRACT DOCUMENTS <br />9.1 The Contract Documents, except for Modifications issued after execution of .this Agreement, are enumerated as follows: <br />9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 1987 <br />Edition. <br />9.1.2 The General Conditions are die General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. <br />9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated <br />March 30, 1990 , and are as follows: <br />Document <br />Title <br />RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR <br />PARTICIPATION IN ORANGE COUNTY CONSTRUCTION CONTRACTS <br />APPENDIX A - RESOLUTION TO ESTABLISH A VERIFIABLE <br />PERCENTAGE GOAL FOR PARTICIPATION BY MINORITY <br />BUSINESSES IN THE AWARDING OF BUILDING CONSTRUCTION CONTRACTS <br />N.C.G.S. 143 -128 <br />APPENDIX B - ORANGE COUNTY MINORITY BUSINESS <br />PARTICIPATION PLAN <br />APPENDIX C - MBE CONSTRUCTION CONTRACT PROVISIONS <br />APPENDIX D - MBE UTILIZATION COMMITMENT <br />APPENDIX E - LETTER OF INTENT TO PERFORM AS A <br />SUBCONTRACTOR OR TO PROVIDE MATERIALS OR SERVICES <br />AIA A -201 GENERAL CONDITIONS <br />OF THE CONTRACT FOR CONSTRUCTION <br />SUPPLEMENTARY GENERAL CONDITIONS <br />Pages <br />iW <br />AWARDED PURSUANT TO <br />1 -4 <br />9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: <br />1 -2 <br />1 -3 <br />1 <br />1 -24 <br />1 -8 <br />(Fitber list the Specifications here or refer to an exblbit attacbed to Ibis A8reentenl -) <br />Section - Title <br />Pages <br />SECTION 01010 - SUMMARY OF THE WORK <br />1 <br />SECTION 01030 - ALTERNATES <br />1 -2 <br />SECTION 01300 - SUBMITTALS <br />14 <br />SECTION 01500 - TEMPORARY FACILITIES <br />1 -4 <br />SECTION 01700 - PROJECT CLOSEOUT <br />1 -4 <br />SECTION 01740 - WARRANTIES AND BONDS <br />1 -2 <br />SECTION 02110 - SITE CLEARING <br />1 <br />SECTION 02200 - EARTHWORK <br />1 -3 <br />SECTION 02210 - SEDIMENT CONTROL <br />1 -2 <br />SECTION 02282 - TERMITE CONTROL <br />1 -2 <br />SECTION 02513 - ASPHALT CONCRETE PAVING <br />1 -2 <br />SECTION 02514 - PORTLAND CEMENT CONCRETE PAVING <br />1 -4 <br />SECTION 02831 - CHAIN LINK FENCES AND GATES <br />1 -3 <br />SECTION 02900 - LANDSCAPE WORK <br />1 -3 <br />SECTION 03310 - CONCRETE <br />1 -4 <br />SECTION 04200 - UNIT MASONRY <br />1 -4 <br />SECTION 05310 - STEEL DECK <br />1 -2 <br />SECTION 06100 - ROUGH CARPENTRY <br />1 -3 <br />SECTION 06192 - PREFABRICATED WOOD TRUSSES <br />1 -2 <br />SECTION 06200 - FINISH CARPENTRY <br />1 -2 <br />SECTION 07200 - INSULATION <br />1 <br />SECTION 07311 - ASPHALT SHINGLES <br />1 -2 <br />SECTION 076W - FLASHING AND SHEET METAL <br />1 -2 <br />SECTION 07900 - JOINT SEALERS <br />1 -2 <br />SECTION 08110 -STEEL DOORS AND FRAMES <br />1 -2 <br />SECTION 08610 - WOOD WINDOWS <br />1 -4 <br />SECTION 08710 - FINISH HARDWARE <br />1 -3 <br />SECTION 08800 - GLASS AND GLAZING <br />1 -3 <br />SECTION 09250 - GYPSUM DRYWALL <br />1 -3 <br />SECTION 09511 - ACOUSTICAL PANEL CEILINGS <br />1 -2 <br />SECTION 09650 - RESILIENT FLOORING <br />1 -2 <br />SECTION 09900 - PAINTING <br />1 -5 <br />SECTION 10605 - WIRE MESH PARTITIONS <br />1 -3 <br />SECTION 10900 - TOILETS AND BATH ACCESSORIES <br />1 -4' <br />SECTION 12390 - KITCHEN CABINETS <br />1 -9 <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • ©1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D,C. 20006 <br />A101 -1987 6 <br />vi! <br />