Orange County NC Website
4 <br />ARTICLE 4 <br />CONTRACT SUM <br />of <br />4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum liars <br />Ore- hundred - ninety- thousand - one- hundred--ninety -- five ---------------------- <br />(S19195.00. ), subject to additions and deductions as provided in the Con- <br />tract currents. <br />s, if any, which are described in the Contract Documents and are <br />4.2 The Contract Sum is based upon the following alternate <br />hereby accepted by the Owner: <br />(State <br />his Agreement. attach a schedule lof such other alternates showing the uruotou for other- <br />Lea each and The dare " ull " b(tbael a m olint s�ali�d.)�� the erecuti �i� nj <br />The Contract is based on the Base Bid less Items l thru 14 as listed on the <br />attachment from Resolute Building Company, dated June 13, 1990. <br />4.3 Unit prices, if any, are as follows: <br />AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • 01967 A101 -1967 3 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NF.W YORK AVENUE.. N.W., WASHINGTON, D.C. 20(XKi /\//lt <br />