Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), <br />Drawings, specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and <br />Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached <br />to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and <br />supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, <br />other than Modifications, appears In Article 9. <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />The Contractor shall execute the entire Work described in the Contract Documents, except'to the extent specifically indicated in <br />the Contract Documents to be the responsibility of others, or as follows: <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of <br />this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice <br />to proceed issued by the Owner. <br />(insert the date of contntencernernt, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) <br />The date of ccut> mneement of work will be established at a later date with a Notice <br />to proceed issued by the Owner. <br />Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the <br />Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens <br />and other security interests. <br />3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than <br />(Insert the calendar date or number of calendar days after the date of ccanmencemenL Also insert any requirements jar earlier Substantial Completion of cer- <br />taln portions of the Work, if not stated elseu here to the Contract Documents.) <br />240 Calendar days after the date established in the Notice to Proceed. <br />, subject to adjustments of this Contract Time as provided in the Contract Documents. <br />(Insert provisions, if arty, for liquidated damages relating to failure to complete on time.) <br />The Contractor shall be assessed $100.00 per day for liquidated damages for <br />failure to complete the project on time. <br />ALA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • ©1987 A1�1 -1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.