Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 5 <br />PROGRESS PAYMENTS <br />5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for PAyn -1cnt issued by the. <br />Architect, the ()« ncr shall make progress payments on aecount of the Contract Sun? to the Contractor :is jrovided below anal <br />el >cahG re in the Contract DOCtln7en[S, <br />5.2 The period coy ere :cl by each Application fir Payment shall be one calendar month ending un the last clay of the nxx7th, nr a; <br />follows: <br />The Progress Payment Date shall be the 25th of each month. <br />5.3 Provided an Application for Payment is received <br />of xt n onthhhecowner shalltmake payment first <br />he Contractor not later than <br />the fifteenth day of the Same month. if an Application for Payment is received by the <br />Architect after the application date fixed above, payment shall be made by the Owner not later than <br />days after the Architect receives the Application for Payment. <br />5.4 Each Application for Payment shall be I)ased upon the Schedule of Values submitted by he Contractor in accordance with <br />[he Contract 1]ocumcnts. "file Schedule of Values SI7aII :illOCate the entire Contract Stun among the various portions of the Work <br />and he prepared in such form and supported by such data tO substantiate its accuracy as the Architect may require Phis Schedule. <br />unless ohjcctcd to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br />5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the encl of the period <br />covered by he Application for Payment- <br />5.6 tiuhject to the provisions of the contract Documents, [he an7ount of each progress payment shat{ be comptted as f0II0«1: <br />5.6.1 'fake that portion of the Contract Sum properly allocable to completed Work as determined by inultiplying El le percentage ill cht: <br />completion of each portion of the Work by he share of the total Contract Sum allocated to that portion of the Work erc'ent <br />Schedule of Values, less retainage of <br />( 10 %). Pending final determination Of cost to the Owner of changes in the Work. amounts not in dispute n7ay he <br />included :ts provided in Subparagraph 7 -3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by <br />Change Order; <br />5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment deli'•ered and suitably storccl at the <br />site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the <br />site at a location agreed upon in writing), less retainage of ten <br />percent ( 10 %); <br />5.6.3 Subtract the aggregate of previous payments made by he Owner; and <br />5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Para- <br />graph 9.5 of the General Conditions. <br />5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the follo'eving <br />circumstances: <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Y„ of the Contract <br />One Hucldred percent ( 100 ) <br />Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and <br />5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional <br />amounts payable in accordance with Subparagraph 9.10.1 of the General Cored {[ions, <br />5.8 Reduction or limitation of retainage, if any, shall be as follows: <br />fl/ it is ink•rrded lu•iur rn Subeuntiul Cnrnpletiurr of rile entire [Vor•k. to reduce or litter[ The retainage resulling•fr-P, 1Ue pertcnrrrge•> inserlrcl ill Slrbprrru- <br />grupbs 5.6. l turd 5 -6._' aillin•e, «rid Ibis is trot eeplained vlselebere in the Cuntrrrcl Drrcrurrenls. insert ber•e Jn•nrrsiurr: /irr srrch vvdrrctiW1 ur linriruliun.r <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWEI.FTII EDITION • AIAS • 81987 A101 -1987 4 <br />THEi AMERICAN INS-111- C7T•.OF ARCHITECTS, 1735 NEW YORK AVENUE. N.W., WASHINGTON, U.C. 20o06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.